BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Louisville, Kentucky. Completed plans call for the renovation of a three-story above grade educational facility.

Jefferson County Public Schools will receive sealed bids and award contract(s) for: Phase I HVAC Renovation at Sam Meyers Hall JCPS Board of Education has established goals and good faith effort of 15% participation for Minority Business Enterprises, and 10% for Women Business Enterprises in all construction contracting. JCPS reserves the right to accept any bid, to reject any or all bids, to waive any informality in bids received where such acceptance, rejection, or waiver is considered to be in the best interest of the Owner SCOPE OF WORK: The Architectural scope of work includes interior renovations, new walls, doors & frames, miscellaneous flooring repairs, ceiling repairs, painting, electrified hardware and other mechanical, electrical and sprinkler work to accommodate the new security vestibules. The following is the primary scope of work at the Sam Meyers Hall- Phase I HVAC Renovation. Refer to drawings and specifications for full details of project. Removal of existing chiller and installation of new packaged air cooled chiller Removal of fan coil units & piping and installation of new air handling units Rework of the piping associated with the existing boilers New variable air volume air distribution system Replacement of existing HVAC controls system Replacement of existing dry-pipe sprinkler system Installation of new domestic water heater and rework of existing domestic water piping Electrical switch gear replacement with service upgrades Power distribution equipment replacements and upgrades New Generator installation Fire alarm replacement Voice/Data System Replacement Security system Replacement Replacement of select receptacles Lighting replacement Miscellaneous low voltage system upgrades and replacements Ceiling Replacement Masonry Repairs New Roofing Hazardous Material Abatement Addendum #1-#2 have been issued as of 10-21-2022.

Award

Educational

$7,570,000.00

Public - County

Renovation

119

36

15

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
36
Bidding Soon
960
All Active Projects
385
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2022

November 16, 2022

img_map_placeholder

1517 S 2nd St, Louisville, KY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.