BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a transportation facility in Spokane, Washington. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

New Administration Building at Spokane International Airport Sia Project shall be the duty of each Bidder to submit his/her bid on or before the hour and date specified. Bids will be opened and read aloud immediately per the bid schedule at the Spokane International Airport Event Center (located at 9211 W. McFarlane Road). Sealed bids will not be accepted via electronic submission. Any bids received after the noted date and times in the bid schedule cannot and will not be considered. Bid Schedule: Bid Schedule Notes: GC/CM will be bidding BP-17, BP-20, & BP-21. A Pre-Bid Conference, followed by a site walk, will be held at the Spokane International Airport Event Center (located at 9211 W. McFarlane Road) on August 6, 2024, at 1:00 pm. The Pre-Bid Conference will be hosted in person only. All subcontractors are encouraged to attend; however, attendance is MANDATORY for BP-01 Earthwork and Site Utilities bidders only. Any bid submitted by a firm which did not attend this Pre-Bid Conference will be rejected. The general nature of the Work is as follows: The project is a new 48,639 square foot administration office building. Level one is 31,045 square feet and consists of the following: parking garage; pre-engineered metal building for additional covered parking; board room and community space; mechanical and electrical rooms and restrooms. Level two is 17,594 square feet for offices, restrooms, wellness space and break rooms The Planholders List is also available at this website. All addenda will be issued through the plan centers. Bidders can register online to be placed on the Planholders List and to receive automatic e-mail notification of addenda. Abadan Reprographics & Imaging, 603 East Second Avenue, Spokane, WA 99202 (Phone: 509-747-2964) should be contacted with website and plan ordering questions. Questions during the bid period will be received up to August 16, 2024, 5:00 pm. Questions shall be directed to the architect, Leslee Randolph lrandolph@mwaarchitects.com. Inquiries regarding bid results (after bid opening) should be directed to Bouten Construction Company, Nick Gonzales nickg@boutenconstruction.com or call 509-535-3531. A subcontract according to the Bid Package documents shall be signed prior to work commencing. Each bid over $300,000 must be accompanied by a cashier's check or surety bid bond, in an amount of not less than five percent (5%) of the total bid for each bid schedules. All subcontractors shall provide separate payment and performance bonds by a qualified surety company acceptable to the GC/CM, each for 100% of the contract sum including all change orders and alternates, when the bid amount is equal to or greater than $300,000. The cost of the payment and performance bonds must be included in their bid amount. If the subcontractor is unable to supply separate payment and performance bonds, the GC/CM may reject their bid and elect to use the next responsible bidder. Liability insurance in accordance with the Bid Package documents will be required for the subcontract. This is a prevailing wage project per applicable State Law. The Spokane Airport Board reserves the right to reject any and all bids, to waive any informality, to accept any alternate bids, and to make such award that it deems to be in the best interest of the Airport pursuant to the terms of the Bid Package documents. The subcontract will be awarded to the lowest responsive and responsible bidder. All bidders are cautioned to be aware of the requirement to have their bids considered responsive. Spokane International Airport is an Equal Opportunity Employer and encourages Women, Minority, Disadvantaged Business Enterprises (MWBE) and small businesses to participate in the competitive bidding process. Bouten Construction Company is committed to the participation in its contracts by MWBE firms certified by the State of Washington's Office of Minority and Women's Business Enterprises (OMWBE). Question Deadline 08/16/2024 at 5:00 PM PT

Post-Bid

Transportation Terminals

$6,000,000.00

Public - County

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
17
Bidding Soon
360
All Active Projects
105
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.