EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 27, 2023 at 8:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Tonawanda, New York. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Thruway Authority continues to have public bid openings, however, there are measures in place to protect the safety and health of employees and visitors alike. Visitors who choose to hand deliver a bid and/or witness the bid opening are limited to one person. Visitors must wear a face mask when entering any Authority building and will have to complete a Wellness Survey the day of the bid opening. The Wellness Survey will be available in the lobby of the Thruway Authority Headquarters building. Please fill out this survey and provide it to the guard at the front desk. If any of the questions are answered "Yes", the visitor will not be allowed entry. Sealed bids should not be sent or delivered to any other address or location, and the Authority is not responsible for any late deliveries or misdirected bids. Contract TAN 22-26B / D214894 Bridge Replacement of Beaver Island Parkway over I-190, Niagara Thruway, at MP N15.46 in the Town of Grand Island in Erie County in accordance with the Plans and Specifications. Your bid must be secured with either a Bid Bond or a Bid Deposit. A Bid Bond must be in the amount of 5% of the total bid and must be on the Authority's Bid Bond Form (TA-44117) which is included in the Proposal. A Bid Deposit must be a certified check or cashier's check made payable to the New York State Thruway Authority in the amount of $375,000.00 The New York State Thruway Authority has discontinued the practice of reproducing and furnishing full-size and half-size plans to Contractors after contract award. Contractors shall be responsible for their own hard copies of plans and proposals at no additional cost to the Authority. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 9% Women Owned Sub-Contracting Goal: 9% Service-Disabled Veteran-Owned Business Contracting Goal: 4% Contract term: 12/01/2023 Location: Beaver Island State Parkway over I-190, MP N15.46

Award

Bridges / Tunnels

$8,327,640.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

110

12

13

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
332
Active Projects
183
Bidding Soon
2,913
All Active Projects
1,284
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2022

November 25, 2022

img_map_placeholder

I-190, Tonawanda, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bridge Replacement of Beaver Island Parkway over I-190, Niagara Thruway

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.