EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 20, 2022 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Franklin, Kentucky. Completed plans call for site work for a playground / park / athletic field; water / sewer project; road / highway; and for paving for a road / highway.

1) New synthetic turf at the football field, including drainage system 2) New synthetic turf at the soccer field, including drainage system and new 8-lane track with new rubberized coating, and lighting 3) New (6) tennis courts, including fencing & bleachers, and new coating and striping, and lighting The Work includes, but is not limited to, selective demolition, site clearing, dewatering, earthwork, storm drainage, asphalt paving, tennis court paving, tennis court surfacing system, chainlink fences and gates, lawns and grasses, base construction and related subsurface work for artificial grass field, infilled synthetic turf system, polyresin track system, track striping, cast-in-place concrete, ornamental handrails and railings, sports equipment, track and field equipment, bleachers, and complete clean-up and removal of construction debris. Bid Guaranty in the form of a Bid Bond (Proposal bonds with Contractor acting as surety are not acceptable), Certified Check, or cash shall accompany each bid. The amount of the bid Guaranty shall be not less than five percent (5%) of the Bid set forth in the Proposal Form. All bid Guaranties shall be made payable to the Simpson County Schools. No bids may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days there from. The scoring of bids/proposals is subject to Reciprocal preference for Kentucky resident bidders and Preferences for a Qualified Bidder. Please refer to specification sections 00220 and 00450. The Owner reserves the right to determine the ability of any bidder to perform the work, and upon the request of the Owner, any bidder shall furnish such information as may be required to make this determination. The successful bidder shall be required to furnish a performance and payment bond and a material and payment bond. The bidder's required Performance and Payment Bond shall be in the combined amount of the materials designated in their bid to be acquired by Purchase Order by the Owner and all remaining items of cost specified in the respective Bid Package. The premium for the bonds shall be included in the proposal amount(s). Provision of Surge Suppression Units at certain points in the power distribution network, on telephone, satellite dish leads and cable television service lines as indicated herein or on the drawings. Proper installation of surge suppression unit(s), in accord with shop drawings. Wiring routing, grounding, raceways and all connections shall be in exact accordance with manufacturer's recommendations, the National Electrical Code, and any other applicable regulations, local or national, or international.

Bid Results

Playgrounds / Parks / Athletic Fields

$948,130.00

Public - County

Paving, Site Work

25

13

13

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Construction, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings, Decorative Metal, Decorative Metal Railings
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Recreational Equipment, Play Field Equipment and Structures
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Public Address and Mass Notification Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
41
Bidding Soon
842
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2022

November 17, 2022

img_map_placeholder

Multiple Locations, Franklin, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.