Demolition, site work, renovation and addition to a fire / police facility in Agawam, Massachusetts. Completed plans call for the addition of a fire / police facility; for the demolition of a fire / police facility; for the renovation of a fire / police facility; and for site work for a fire / police facility.

As of January 18, 2024, this project has been completed. A detailed scope has not yet been released. *The closed solicitation has been included below for reference: As directed by the Town Officials, the main objective of the study was to analyze the possible adaptive reuse options of the 1070 Suffield Street building and site for public safety facilities. These main objectives are: 1. New Police Headquarters through modification and renovations of the present 1070 Suffield Street building and site. 2. New Police Headquarters and New Fire Sub Station through construction of a new Fire Department Sub Station on the present site with the new Police Department Headquarters within the existing 1070 Suffield Street facility. Option P1 is the layout that maximizes the reuse of the existing 1070 Suffield Street building and site. Within this scheme, many of the existing office spaces, core facilities, entrances and utility spaces are maintained while accommodating the Police Department’s programmatic needs. As part of the P1 Option, the majority of the site configuration is also maintained to serve the Police Department. The present parking driveways, site utilities and parking configuration are maintained. The overall construction cost for this option is $7,729,378.00 with a Total Project Budget Cost of $9,478,078.00. The Option FP-2 demonstrates a layout to accommodate the construction of a new Fire Department Substation on the 1070 Suffield Street site with the Police Department occupying a renovated existing building as described in the P1 Option. The FP-2 Option requires considerable site redesign and requires considerable lot coverage for the two buildings, parking lots and added driveway. The overall construction cost for this option is $16,140,739.00 with a Total Project Budget Cost of $19,585,739.00. The method of Contractor Selection has not been Determined at this time.

Occupancy

Fire / Police

$19,585,739.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
360
Active Projects
186
Bidding Soon
3,255
All Active Projects
1,439
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2023

img_map_placeholder

To Be Determined, Agawam, MA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.