BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 4, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a civil project in Ada, Minnesota. Completed plans call for site work for a road / highway; and water / sewer project.

As of 12/13/2022 Start date: Sometime April or May 2023 End date: Sometime September or October 2023 Rehabilitation of Sanitary Sewer Collection System through 8" - 18" CIPP, Sanitary Manhole Replacement & Rehabilitation & Roadway Patching. BID DOCUMENTS ARE NOT YET AVAILABLE FOR DOWNLOAD. Scope: Preparatory work and operations including 1. Movement of personnel, equipment, and supplies. 2. Establishment of temporary facilities. 3. All other work and operations that must be performed, or costs incurred, before beginning work on the project.

Award

Water / Sewer

$1,595,897.00

Public - City

Site Work

30

15

4

8

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
21
Bidding Soon
255
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2022

April 3, 2023

Project location map

Multiple Locations, Ada, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.