BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Coventry, Connecticut. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of May 3,2023, this project has not yet been awarded. A timeline for award has not yet been established. Contract Goal 15% Disadvantaged Business Enterprises (DBEs)The Town of Coventry (Municipality) hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, Disadvantaged Business Enterprises will be afforded full opportunity to submit bids in response to this invitation and that they will not be discriminated against on the grounds of race, color, national origin, sex, sexual orientation, mental retardation or physical disability, including but not limited to blindness, in consideration for an award. Bid Proposal Form, Schedule of Prices, Bid Bond, Non-Collusion Affidavit and Bidders Prequalification approval letter signed by the CTDOT Contracts Manager must be completed and returned with the submitted bid. Failure to properly execute and include any one of these five documents in the bid submission will result in the bid not being read and the subsequent rejection of the bid. A certified check will not be accepted. The Municipality reserves the right to reject any and all bids.NOTE: All bidders shall submit the Pre-award DBE Commitment Approval Request form(s) to the Municipality NO LATER THAN FIVE (5) calendar days after the bid opening. This is a requirement of Title 49, Code of Federal Regulations (CFR) Part 26, Participation of DBEs. Any bidder that fails to submit the required DBE forms within the required time will not be eligible for contract award.CONTRACTORS that find discrepancies and/or errors in or between plans, specifications, quantities and other matters, must immediately notify Todd Penney, P.E., Town Engineer, in writing at tpenney@coventryct.org not less than ten days before the scheduled bid opening. Printed copies of the Bidding Documents will be made upon payment of a non-refundable fee of $245 for each set. Checks for Bidding Documents shall be payable to Action Blueprint. There will be an additional charge for mailing to be determined at the time of contact. To receive the documents via package services, send a completed pre-paid pickup label from UPS to the Issuing Office. PDF copies are available upon request after the receipt of the non-refundable fee. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidders date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office.Form 818 Standard Specifications and Supplemental Specifications may be obtained via electronically. All Proposals must be on the form furnished by the Municipality and must be requested for the above-named project.NOTE: Prospective bidders must have a current sworn Statement (CON-16) on file with the Connecticut Department of Transportation and be prequalified to perform Group No. 9 Intermediate Bridges work. The Bidders Prequalification approval letter signed by the CTDOT Contracts Manager shall be included as part of the bid package submitted to the Municipality.NOTE: Any Contractor or Subcontractor engaged in surface preparation and/or coating application must be certified by the Steel Structures Painting Council.NOTE: A Surety Company Bond, on the form furnished by the Municipality, for at least 30 percent of the amount of the bid must accompany each proposal. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$3,646,023.00

Public - City

Demolition, New Construction, Paving, Site Work

74

6

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
263
Bidding Soon
3,806
All Active Projects
1,657
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2023

June 19, 2023

img_map_placeholder

Hop River Rd, Coventry, CT


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.