BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Zeeland, Michigan. Completed plans call for the renovation of a 37,963-square-foot educational facility.

Cityside MS Renovations, East HS PE Addition & Renovations West HS PE Renovations - Bid Package 3B (Bid Category 14 - Flooring - Rebid) The Project consists of interior building renovations to Cityside Middle School, a fitness addition and renovations to East High School, and fitness renovations to West High School for Zeeland Public Schools 2021 Bond Issue. Bid proposals were previously received on 08/08/2022 for Bid Categories 01 thru 21 and have been awarded to successful bidders. This bid proposal issuance is strictly for the re-bidding purposes related to Bid Category 14 - Flooring ONLY. A Pre-Bid Conference is currently not planned at this time. One can be scheduled based on bidder demand. If you desire need to see existing buildings and conditions, please reach out in advance and by Friday 10/30/2022 for allowing time to schedule a time: Dave Fleece - 616-566-3806 Email: davef@oakmi.com Locations- 320 E. Main St. (Cityside MS) - TOTAL RENOVATED PROJECT: 15,376 SQ. FT 3333 96 th Ave. (East HS) - TOTAL RENOVATED PROJECT: 11,432 SQ. FT. 3390 100 th Ave. (West HS) Zeeland, MI 49464 - ATHLETICS FITNESS ADDITION: 6,655 SQ. FT. ; ATHLETICS INTERIOR RENOVATIONS: 4,500 SQ. FT. 1. Tiling, Resilient Base and Accessories, Resilient Athletic Flooring, Sheet Carpeting 2.Minor preparation of floor and wall surfaces such as grinding, patching, latexing, latence, scum and paint removal, etc. 3. Final cleaning of tile surfaces. 4. All required trims, reducers and base related to all flooring material types and specifications. 5. Caulking of control joints in tile surfaces. 6. Include all setting beds as required for achieving finish floor elevations shown and/or required to match existing finish floor elevations. 7. Moisture testing prior to all flooring installations. Forward testing reports to CM and Architect. 8. Include floor patching work with owner stock at locations shown on drawings. 9. Include logo/graphics at lifting drop zones/stations on athletic flooring in weight rooms. 10. Provide unit cost ($/SF) on bid form to apply a ASTM F3010-qualified Moisture Vapor Emission Control system. Project No- 21-171.55, 1510128.5A

Post-Bid

Educational

$300,000.00

Public - City

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
31
Bidding Soon
493
All Active Projects
201
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2022

March 31, 2023

img_map_placeholder

Multiple Locations, Zeeland, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.