BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Pontiac, Michigan. Contact the soliciting agency for additional information.

The project entails the following statement of work: The contractor shall furnish but is not limited to all necessary personnel, material, equipment, services, and facilities required for the satisfactory completion, improvement, and construction of all items at the project site as indicated on the drawings and specified herein. This work must include the improvements and construction of all or a portion of the following items: Gravel surfacing of approximately 4 miles of ORV routes between Felch and Foster City for a total of 4,300 cubic yards of gravel. Depending on the project location, individuals may be required to wear masks to attend meetings and for a firm to be eligible to submit bids / quotations / proposals. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance must be followed ACCEPTING QUESTIONS UNTIL: 10/5/2022 12:00pm EST This project entails the following special requirements and notification: A. The contractor shall provide suitable equipment for all work. The equipment shall be in good working condition and shall be operated by individuals who are properly trained and skilled for such equipment. B. The contractor shall be responsible for obtaining all permits and complying with all pertinent regulations of governmental agencies having jurisdiction. C. The contractor shall verify that the culverts are properly aligned and undamaged after reconstruction. In the event that they do become damaged, the contractor is responsible for replacing them without additional compensation. D. In the event of conflict between or among specified requirements and pertinent regulations, the more stringent requirements will govern when so directed by the project manager. E. The contractor shall thoroughly inspect the premises prior to commencing work. The contractor shall also determine the extent of work required and the need for temporary shoring and/or permanent structural changes. F. The contractor shall comply with Act 174, P.A. of 2013, by notifying the public utilities of the proposed work at least 48 hours prior to the commencement of such activities by contacting MISS DIG @ 800-482-7171 or www.missdig.net. G. I t shall be the responsibility of the contractor to determine the exact location of all existing utilities. For those utilities to remain in service, the contractor shall make temporary and/or permanent relocations, as necessary, to comply with the drawings. Project has been Awarded to :- Rodney Carlson Bulldozing In the amount of $79,900.00

Award

Roads / Highways

$79,900.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
74
Bidding Soon
1,364
All Active Projects
544
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2022

November 11, 2022

img_map_placeholder

Multiple Locations, Pontiac, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.