Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Lansing, Michigan. Completed plans call for site work for a water / sewer project.
**As of November 29, 2022, project was awarded to Dunigan Bros., Inc, awarded amount is $8,121,732.50.** 1. The principal items of work consist of the following: a. Schedule A: Construction of approximately 400 lineal feet of 24-inch water main via open excavation along Mt. Hope Highway and 750 feet of 24-inch water main via directional drilling crossing under I-96, and associated valves, fittings, and other appurtenances. b. Schedule B: Construction of approximately 7,680 lineal feet of 20-inch water main via open excavation or directional drilling from Delta Townships GM booster station located south of Millett Highway to the proposed Ultium 3 Battery Plant facility north of Davis Highway, 260 lineal feet of 16-inch water main via open excavation, 470 lineal feet of 20-inch water main directionally drilled under RE Olds Drive and GM entrance north of Davis Highway, and associated valves, fittings, and other appurtenances. c. Schedule C: Construction of approximately 7,590 lineal feet of 10-inch sanitary force main via open excavation or directional drilling from Delta Townships GM pump station located south of Millett Highway to proposed Ultium 3 Battery Plant facility north of Davis Highway, 60 lineal feet of 8-inch sanitary force main via open excavation, 380 lineal feet of 10-inch sanitary force main directionally drilled under RE Olds Drive and GM entrance drive north of Davis Highway, and associated valves, fittings, and other appurtenances. d. Schedule D: Construction of approximately 870 lineal feet of 20-inch water main via open excavation or directional drilling from Delta Townships GM booster station located south of Millett Highway to Deltas existing Millett Tower water tank north of Millett Highway, 160 lineal feet of 20-inch water main directionally drilled under Millett Highway, 160 lineal feet of 16-inch water main on the Millett Tower site, and associated valves, fittings and other appurtenances. e. Schedule E: Construction of approximately 2,550 lineal feet of 12-inch directionally drilled force main and 590 lineal feet of 12-inch open excavated force main running north from Delta Townships GM pump station and east along Millett Highway, crossing under I-96 to Canal Road. Construction of 150 lineal feet of 12-inch gravity main in 36-inch steel casing, jack and bored under Canal Road. The purchaser must supply the email address, telephone and facsimile numbers, and street address of the individual or firm to whom addenda (if any) can be directed. A Bid Security in the form of a certified check, bank check, or Bid Bond for a sum not less than five percent (5%) of the amount of the Bid will be required with each Bid.
Award
Water / Sewer
$8,121,733.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 2, 2022
December 2, 2022
Multiple Locations, Lansing, MI
Related To This Project
Lansing, MI
Bid Date: Nov 02 2022
Lansing, MI
Bid Date: Oct 17 2022
Lansing, MI
Bid Date: Oct 17 2022
Lansing, MI
Bid Date: Aug 22 2022
Lansing, MI
Bid Date: Jun 14 2023
Lansing, MI
Bid Date: Aug 15 2023
Lansing, MI
Bid Date: Oct 27 2022
Lansing, MI
Bid Date: Oct 27 2022
Lansing, MI
Bid Date: Nov 09 2022
Lansing, MI
Bid Date: Nov 03 2022
Lansing, MI
Bid Date: Oct 31 2022
Lansing, MI
Bid Date: Nov 17 2022
Lansing, MI
Bid Date: Oct 17 2022
Lansing, MI
Bid Date: Nov 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.