BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Marrero, Louisiana. Completed plans call for the renovation of a playground / park / athletic field.

We extend this bid to cover all labor, materials, equipment and necessary essentials to install play structure, concrete slab and sidewalk and poured in place rubber safety surface at Lincolnshire Walking Track. A bid bond will be required with bid submission in the amount of 5% of the total bid. A Payment Bond in the amount of 50% of the contract price is due at the signing of the contract. A Performance Bond in the amount of 50% of the contract price is due at the signing of the contract. The work shall be substantially complete within is 180 calendar days of the written notice to proceed and completed and shall be ready for final acceptance no more than 30 calendar days after substantial completion. In accordance with Resolution No. 113646, as amended, and Resolution No. 138482, Bidder agrees to pay, as liquidated damages, the sum of $250-00 for: (1) each consecutive calendar day after the agreed date of substantial completion that the work remains substantially incomplete, and (2) each consecutive calendar day after the 30th day following the actual date of substantial completion that the work has not been finally completed.

Award

Playgrounds / Parks / Athletic Fields

$105,784.00

Public - County

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
33
Bidding Soon
507
All Active Projects
216
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2022

November 25, 2022

img_map_placeholder

6400 Rue Louis Phillippe, Marrero, LA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.