Renovation of a water / sewer project in Arlington, Texas. Completed plans call for the renovation of a water / sewer project.

SEWER PROJECT# 59019-0700430-003030-102652-9999 PROJECT NO - 4200302 New pumped mixing systems, overflow box repairs, and dome rehabilitation for Digester Nos. 1-6 New gas safety equipment for Digester Nos. 1-14 Digester Control Building No. 1 electrical switchgear improvements including architectural rehabilitation and replacement of HVAC Two new digester gas flares, a condensate vault, and 30-inch low pressure digester gas pipeline A new, three-vessel hydrogen sulfide removal system Two new refrigerate gas dryers and chillers Additive alternate bid items, including: dome rehabilitation for Digester Nos. 7-8, replacement of electrical transformers PA9 and PA10 including switchgear, and brick investigation and repairs at Digester Nos. 1 - 6 Completion- 1,095 days ENGR'S ESTIMATE: $35,200,000 The major work will consist of the (approximate) following: o Improvements at Digester Nos. 1 - 6 include dewatering & cleaning, new digester pumped mixing systems, new gas safety equipment, coping repairs, dome steel repairs, dome recoating, dome insulation replacement, fall protection, and overflow box repairs. o New gas safety equipment at Digester Nos. 7 - 14. o Improvements at Digester Control Building No. 1 include architectural rehabilitation and replacement of HVAC, electrical gear, transformers, feeders, and conduits and conductors to served equipment. o Two (2) new digester gas flares, condensate vault, and 30-inch Low Pressure Digester Gas pipeline. o New H2S Removal System with three (3) vessels on concrete foundation on piers. o Two (2) new refrigerative gas dryers and two (2) new chillers. o Additive alternate items at Digester Nos. 7 & 8 include dewatering & cleaning, additional gas safety equipment, coping repairs, dome steel repairs, dome recoating, dome insulation replacement, fall protection, and overflow box repairs. Inclusion of additive alternate items in this project is not guaranteed. o Additive alternate item for replacement of Electrical Transformers PA9 and PA10 including Switchgear. Inclusion of additive alternate items in this project is not guaranteed. o Additive alternate items for brick repairs at Digester Nos. 1 - 6. Inclusion of additivealternate items in this project is not guaranteed.

Award

Water / Sewer

$36,925,000.00

Public - City

Renovation

297

30

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
56
Bidding Soon
3,543
All Active Projects
1,250
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2022

January 9, 2023

img_map_placeholder

4500 Wilma Ln, Arlington, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.