BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Thornton, Colorado. Completed plans call for site work for a water / sewer project.

This includes the design required for bidding and construction of potable water pipeline improvements at nine locations. Complete design plans and bid packages will be required for bidding and installation of the following: Bellaire Court (Cul-de-sac) - Remove 215-linear feet of existing 4-inch diameter ductile iron water line along Bellaire Court and replace with 6-inch diameter PVC water line. 107th Place and Clermont Street (Cul-de-sac) - Remove 315-linear feet of existing 4-inch diameter ductile iron water line along 107th Place and Clermont Street and replace with 6-inch diameter PVC water line. 123rd Avenue/Jasmine Street - Remove and replace or rehabilitate 2,910-linear feet of existing 12-inch diameter ductile iron water line along 123rd Avenue/Jasmine Street from Holly Street to East 120th Avenue with 12-inch diameter PVC water line. Columbine Court - Remove and replace 705-linear feet of existing 6-inch diameter ductile iron water line along Columbine Court with 6-inch diameter PVC water line and reconnect back to East 124th Drive. East 107th Place - Remove and replace 875-linear feet of existing 8-inch diameter ductile iron water line along East 107th Place with 8-inch diameter PVC water line. 96th Way - Remove and replace 1,910-linear feet of 8-inch diameter asbestos cement water line along 96th Way with 8-inch diameter PVC water line and reconnect to East 97th Avenue. East Moon Court Between Roosevelt Avenue and 90th Place - Remove and replace 275-linear feet of 10-inch diameter asbestos cement water line along 96th Way with 10-inch diameter PVC water line from East 90th Place to Carnation Street. Fairfax Way (Cul-de-sac) - Remove 440-linear feet of existing 6-inch diameter asbestos cement water line along Fairfax way, and replace with 6-inch diameter PVC water line. Cherokee Tank Waterline - Rehabilitate 5,515-linear feet of existing 20-inch spiral welded steel pipe with a recommended trenchless rehabilitation method that provides structural pipe support. Buyer's Requirements General Requirements - Insurance Required - License Required Questions are submitted online No

Post-Bid

Water / Sewer

$4,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
38
Bidding Soon
983
All Active Projects
412
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2022

December 26, 2022

img_map_placeholder

Multiple Locations, Thornton, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.