Published November 1, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Fort Collins, Colorado. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and sidewalk / parking lot.

The Work of this Contract consists of repair and replacement of concrete curb and gutter, concrete paving, concrete flatwork, re-sealing expansion joints, partial depth repair and concrete joint sealant at the South Transit Center (STC), and Downtown Transit Center (DTC). It is the intent of the Owner not to disturb the normal functions of the Transfort facilities, its employees, vendors, visitors, contractors, or related outside businesses during the Work of this project. Communication with the Owner and Engineer will be critical in order to maintain operations and achieve project goals to minimize impacts to daily operations. The Work included in the contract comprises all work completed by the Contractor to repair or remove and replace concrete joint sealant, curb and gutter, and pavement at the South Transit Center, and Downtown Transit Center. Portions of the crosswalks at the South Transit Center will be replaced. The required color for the concrete in the crosswalks is Solomon Colors 920 Smoke. Excavation and aggregate base course will be required in connection with the pavement replacement. The project includes tasks described herein and as outlined on the project plans. All questions not addressed at the pre-bid must be submitted in writing via email to Annabelle Phillips at aphillips@fcgov.com, with a copy to Adam Hill at adhill@fcgov.come, no later than 3:00 PM our clock on October 14, 2022 Question Acceptance Deadline 10/14/2022 05:00 PM EDT Questions are submitted online No

Bid Results

Transportation Terminals

$136,266.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Concrete Curing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Trenching, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
48
Bidding Soon
936
All Active Projects
414
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2022

November 24, 2022

img_map_placeholder

4915 Fossil Blvd, Fort Collins, CO

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Transfort Concrete Improvements at STC & DTC

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.