BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Marana, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of July 2023, this project is under construction. To address and accommodate planned development in the area, Phase 2 of the Tangerine Road Corridor improvements will be constructed in two-phases. The western two-and-a-half miles (Phase 2A), from I-10 through Tangerine Business Loop is slated to be constructed first, with a start date estimated for mid-2023. Design of Phase 2B, Dove Mountain Boulevard/Twin Peaks Road to Tangerine Business Loop, will continue during construction of Phase 2A. Design elements for Phase 2A include: -Widening of Tangerine Road to a four-lane desert parkway with paved shoulders and a curbed median. -Improved drainage to convey 100-year storm events under the roadway through a combination of channels and culverts. -12-foot-wide multi-use-path along the north side of the roadway. -Signalized intersection at Adonis Road with improved access to accommodate future development. -Frontage road along the south side of Tangerine Road providing access to Marana Tech Center current and future businesses. -Widening for capacity improvements and pedestrian/bicycle connectivity at the I-10 Tangerine Road Traffic Interchange (TI). “The previous solicitation has been included below for reference:” The Town of Marana's Department of Public Works (Town) seeks a Contractor to provide Construction Manager At Risk (CM@Risk) services for Pre-Construction Services during the design of Phase 2A of the Regional Transportation Authority (RTA) funded widening of Tangerine Road Corridor Project between Interstate 10 and Tangerine Business Park Loop and the interim Traffic Interchange at I-10 if an acceptable guaranteed maximum price (GMP) is provided by Contractor. Through this opportunity, the Town seeks to establish an innovative, solutions-oriented evaluation of the design for the improvement and widening of this major roadway corridor from a two-lane rural roadway to a desert parkway arterial roadway and the interim traffic interchange at Tangerine Road and I-10.

Under Construction

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

4

7

2

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
16
Bidding Soon
605
All Active Projects
216
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2022

July 17, 2023

img_map_placeholder

Tangerine Road, Marana, AZ


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.