Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, new construction, renovation and addition to a mixed-use development in Raleigh, North Carolina. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
It is the Owner's intention to select Construction Manager at Risk firms for one new small high school, one renovation/addition existing high school, one renovation/replacement existing middle school, and renovation/replacement of two existing elementary schools, within the Wake County Public School System. A. HS3 High School: Provide complete construction management services for a proposed new small high school located in western Wake County to serve a student population of approximately 1200. Design to begin May 2023, construction begins September 2025 for a summer 2027 completion. B. Athens Drive Magnet High School: Provide complete construction management services for a multi-phased addition/renovation project to include increasing student capacity from 1,600 to 2,350 for the existing occupied campus at 1420 Athens Drive in Raleigh. This Center for Medical Sciences and Global Health Initiatives Magnet Program also incorporates a Health Sciences Career Academy + STEM Academy of Energy and Sustainability. Multiple classroom spaces will be added along with expansion of the existing cafeteria. Renovation of existing spaces will also be included as part of this project. Design to begin summer 2023, construction begins summer 2026 for a summer 2028 completion. C. North Garner Middle School: Provide complete construction management services for a multi-phase renovation/addition at an existing occupied campus located at 720 Powell Drive, Garner, NC. The scope of work includes a 236,660 square foot middle school with 81 teaching spaces, student capacity of 1,248, and core capacity of 1,450. Site elements must meet current program standards. The design and sequencing of the work will require the development of a phasing plan and schedule that will allow the school to operate during construction. It is the Owner's desire to retain as much of the existing facilities as reasonably possible and to bring those facilities up to current standards. Phasing of site improvements and organization of temporary on-campus swing space will be required. Design to begin January 2023, construction begins summer 2025 for a summer 2027 completion. D. Lockhart Elementary School: Provide complete construction management services for a multi-phase renovation and addition at an existing occupied campus located at 1320 N. Smithfield Road, Knightdale, NC. The scope of work includes a 132,495 square foot elementary school with 56 teaching spaces, student capacity of 716, and core capacity of 800. Site elements must meet current program standards. The design and sequencing of the work will require the development of a phasing plan and schedule that will allow the school to operate during construction. It is the Owners desire to retain as much of the existing facilities as reasonably possible and to bring those facilities up to current standards. Phasing of site improvements and organization of temporary on-campus swing space may be required. Design to begin April 2023, construction begins September 2025 for a summer 2027 completion. E. Brentwood Elementary School: Provide complete construction management services for renovations and additions at an existing campus located at 3426 Ingram Drive, Raleigh, NC. The scope of work includes maximizing use of the site for a 500 student capacity elementary school. Site elements must meet current program standards. It is the Owner's desire to retain as much of the existing facilities to remain as reasonably possible and to bring those facilities up to current standards. Staff and students will be swinging off-campus during construction. Design to begin early 2023, construction begins September 2025 for a summer 2027 completion. If you have any questions, please contact Scott Lowder, slowder@wcpss.net .
Post-Bid
Educational
$460,000.00
Public - County
Addition, Demolition, New Construction, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 25, 2022
September 1, 2025
Multiple Locations, Raleigh, NC
Related To This Project
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
Bid Date: Nov 30 2022
RFQ Contractor - Residential Construction Services - Acquisition, Demolition and Elevation - 4691955
Raleigh, NC
Bid Date: Jun 30 2023
Raleigh, NC
Bid Date: Oct 11 2022
Raleigh, NC
--
Raleigh, NC
Bid Date: Oct 04 2022
Raleigh, NC
--
Raleigh, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.