BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Sylvester, Georgia. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

** As of December 6, 2022, bids received were rejected. Project will rebid but no definite date yet.** Any Contractor performing the proposed work must be a licensed contractor in accordance with the work perform and as required by the State of Georgia. The Work To Be Done shall consist of furnishing all products and performing all labor necessary to construct the Parking Area Improvements including +/-14,000 square feet concrete paving replacement (4000 PSI with commercial fiber) with a minimum thickness of 6 inches, with joints needing to be pegged and all other appurtenances necessary to complete the project. Existing concrete to be demolished shall be stockpiled onsite and removed by others. The area to be improved is in the back of the building located at 103 Old State Route 50, Sylvester, GA 31791. Contractor is to assume the existing lot has good dirt and compaction. The work will be awarded in one contract with a contract time of 60 consecutive calendar days. Bidders are encouraged to visit the site prior to submitting a bid. All bids must be accompanied by a Bid Bond in an amount not less than ten percent (10%) of the amount bid. The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the Contract amount. All bonds must appear on the Treasury Department's most current Circular 570 Listing. Pre-Bid Conference: There will be no pre-bid conference. Permits: No permits are expected. Land/Easement Acquisition: No land acquisition is expected to be required for this project. Funding: Any Contract or Contracts awarded under this Invitation to Bid are expected to be funded by the Worth County EDA. The Owner reserves the right to reject any or all bids, to waive informalities, and to re-advertise.

Final Planning

Sidewalks / Parking Lot

$501,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
19
Bidding Soon
274
All Active Projects
109
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2022

June 6, 2023

img_map_placeholder

103 Old State Rte 50, Sylvester, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.