Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Alpharetta, Georgia. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; for outdoor lighting for a road / highway; and sidewalk / parking lot.

As of December 19, 2022. The project has been awarded with the amount of $9,557,603.40 Bid requested for WEBB BR RD BRIDGE REPLACEMENT & ROAD IMPROVEMENT including, but not limited to, roadway construction & widening; installation of curb & gutter, sidewalks, storm drain structures & pipes; construction of retaining walls; replacement of bridge; installation of pedestrian lighting, landscaping, & related work. The work is along Webb Br Rd between N. Point Pkwy & Big Creek Greenway within City. Issued under authority of City of Alpharetta Procurement Policy, following Georgia & Federal applicable laws. City has right to reject all bids, to reject any bid that has not followed or met Citys specifications (non-responsive) or reject any bid that shows that bidder cannot meet one or more requirements (non-responsibility). City has right to ignore unimportant mistakes that do not affect the work or pricing in order to award a contract that is in best interest of the City. Land Disturbance Permits from City will be issued for project. NOI will be submitted prior to NTP. EPD permit will be obtained by NTP. Stream buffer variance approved. The City has applied for USACOE wetland. Wetland permit expected to be approved prior to construction NTP. All anticipated rights of way and/or easements required for project will be obtained by NTP. Schedule of Items will be used as primary representation of Bidders price. Award of project will be by base bid plus any selected alternates. Awarded Contractor required to continuously pursue Work without interruption to completion, and achieve Final Completion of Work in 900calendar days. Liquidated damages will apply per GDOT Standard Specifications for Construction of Transportation Systems 2021 Section 108.08. Bidders required to submit 5% bid bond of bid price with each bid prior to bid due date/time. Payment & Performance bonds in amount of 100% awarded bid will be required from awarded contractor. Performance bond must have provision to keep bridge in good condition for a period of not less than seven years. WEBB BRIDGE ROAD INTERSECTION IMPROVEMENTS - MAID MARION CLOSE TO WEBB BRIDGE PARK includes, but is not limited to, maintaining traffic control measures, roadway construction and widening, installation of curb and gutter, installation of sidewalks, installation of storm drain structures and pipes, construction of retaining walls, replacement of the bridge crossing Big Creek, installation of pedestrian lighting, and installation of landscaping within the City of Alpharetta, Georgia

Award

Bridges / Tunnels

$9,538,603.00

Public - City

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

266

7

5

5

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
208
Bidding Soon
2,346
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2022

November 28, 2022

Project location map

Webb Bridge Rd, Alpharetta, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.