BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2022 at 7:00 PM

Updated August 15, 2025

Site work, paving and outdoor lighting for a mixed-use development in Alpharetta, Georgia. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; and for paving for a road / highway.

City of Alpharetta is requesting bids for the WEBB BR RD INTERSECTION IMPROVEMENTS, including, but not limited to, roadway construction & widening; installation of curb & gutter, sidewalks, storm drain structures and pipes; construction of retaining walls & a roundabout at Webb Bridge Rd and Webb Bridge Way, installation of pedestrian lighting and landscaping, and related work within City of Alpharetta. City has right to reject all bids, to reject any bid that has not followed or met City specifications (non-responsive) or reject any bid that shows bidder cannot meet one or more of the requirements (non-responsibility. Enter all questions or comments using Opportunity Q&A tab at the Bonfire project web page. Debora can be reached at 678-297-6052 or purchasing@alpharetta.ga.us. City of Alpharetta 2 Park Plaza Alpharetta, GA 30009 Attn: Debora Westbrook, Procurement Agent The City has right to ignore unimportant mistakes that do not affect the work to be provided or pricing to award a contract that is in the best interest of the City. Bid Date: 5% Performance Bond: 100% Payment Bond: 100% The CONTRACTOR shall promptly commence the Work with adequate force and equipment within ten (10) calendar days from receipt of Notice to Proceed, or as may be specified by Special Provision, continuously pursue the Work without interruption to completion, and to achieve Final Completion of the Work in five hundred forty (540) calendar days. Liquidated damages will apply per GDOT Standard Specifications for Construction of Transportation Systems, 2021, Section 108.08. If the Contractor fails to achieve Substantial Completion and/or Final Completion by the dates set forth in the resulting contract, the Contractor shall be liable to the City for the sum of: $1,169.00 per day for each and every calendar day of unexcused delay in achieving Substantial Completion beyond the date set forth in the Contract; and $1,169.00 per day for each and every calendar day of unexcused delay in achieving Final Completion beyond the date set forth in the Contract, as applicable.

Award

Roads / Highways

$3,994,545.00

Public - City

Outdoor Lighting, Paving, Site Work

162

7

15

6

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
6
Bidding Soon
1,294
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2022

November 28, 2022

Project location map

Webb Bridge Rd & Webb Bridge Way, Alpharetta, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.