BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition and site work for a water / sewer project in Huntington Beach, California. Completed plans call for site work for a water / sewer project.

**As of December 21, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The City of Huntington Beach (City) has elected to cease operations of the 3 City owned and operated oil wells and associated facilities (other than the leased Miley Keck Tank Farm). The City intends to award one (1) service contract from this solicitation to abandon the 3 oil wells, remove appurtenances, and abandon pipelines from the Civic Center to the Miley Keck Tank Farm. 1. Supply all materials, equipment, labor, travel, and services to plug and abandon the 3 wells and facilities according to specifications listed in the Well Conditions and Abandonments Specifications. See exhibits 1 through 3 for the well history of each well. 2. Well work and services shall be performed on the Civic Center lease located at 2000 Main Street, Huntington Beach, California as well the public right away from the Civic Center to the Miley Keck Tank Farm. The entrance to the parking lot is on Yorktown Avenue immediately north of the well. 3.The rods, rod pump and tubing shall be removed from the well and delivered to the designated laydown yard. The well shall be cleaned out to 2,950' or as deep as possible. All depths noted are KB measurements unless otherwise noted. Remove 5-1/2", 15# tie back sleeve if needed to meet Cal-GEM zonal isolation requirements. The rods, rod pump and tubing shall be removed from the well and delivered to the designated laydown yard. 4. Cut and pull 2-7/8" inner liner to allow recovery of tubing fish. Consideration should be given to removal of upper portion of inner liner and repair of casing holes from 2,304' - 2,345' prior to removal of remainder of inner liner. 5. Perform a CBL from cleanout depth to surface to ensure hydrocarbon isolation. If cement is bad, squeeze jobs may be required. 6. Isolate all the hydrocarbon zones, the USDW and the BFW. 7. All casing of the well, both inside and outside, shall be plugged with cement from at least 30 feet below the final cut down of the well to surface. 8. All casing shall be exposed and cut off 5' below ground level. Contact Info Jennifer Anderson 714-374-1569 jennifer.anderson@surfcity-hb.org Online Q&A Yes Q&A Deadline 09/20/2022 4:34 PM (PDT) The schedule of performance of the Agreement shall be from date of executed contract through December 31, 2023 Response Format Electronic Project Type RFP (Request for Proposal) Response Types Response File Type of Award Lump Sum

Bid Results

Water / Sewer

$20,000.00

Public - City

Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
110
Bidding Soon
2,439
All Active Projects
1,061
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2023

October 20, 2023

img_map_placeholder

2000 Main St, Huntington Beach, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.