BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a stadium in Thames Centre, Ontario. Conceptual plans call for the addition of a 7,500-square-foot, one-story above grade stadium; for the demolition of a stadium; for the renovation of a stadium; and for site work for a stadium.

Thames Centre is seeking proposals from qualified firms to provide design and construction services for the renovation and expansion of the FlightExec Centre, located at 2066 Dorchester Road, Dorchester, Ontario. The core project will involve increasing and optimizing the square footage for 3 existing parts of this facility - the Senior Centre, the V.O.N. and the auditorium. The Senior Centre will have larger spaces and additional rooms, expanding from the current 3,402 square feet to approximately 9,200 square feet. The V.O.N. space will approximately double from the current size of approximately 3,000 square feet. The auditorium will expand from 4,321 to approximately 6,000 square feet. This "expansion" project will not only be an addition to the existing facility, but also involve renovations to existing space. In addition, this project has the potential to include other aspects, which we refer to as "provisional items". Firstly, this project could include the inclusion of a gymnasium (approximately 7,000 square feet), to be priced in two ways - as a stand-alone gym and/or as a gym incorporated into the auditorium portion of this project. Secondly, this project could include moving the current Municipal Office (located at 4305 Hamilton Road) into new office space at the FlightExec Centre (approx. 8,500 square feet). The final provisional item will be consideration of upgrades to the project which provide green initiatives. The intention of this project is to award the design-build contract upon completion of the 2023 budget process in January 2023, thus allowing the successful bidder to break ground right away, in January, with project completion by September 2023. Final date for Proponent questions: November 10, 2022 Project has been abandoned.

Project Abandoned

Arenas / Stadiums

$2,000,000.00

Public - County

Addition, Demolition, Renovation, Site Work

24

6

15

12

Subscribe For Documents

84 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
53
Bidding Soon
880
All Active Projects
360
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2022

February 22, 2023

img_map_placeholder

2066 Dorchester Rd, Thames Centre, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.