EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 7, 2022 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Altoona, Alabama. Completed plans call for site work for a water / sewer project.

Plans and specifications are for viewing purposes only and in order to be considered an official bidder contractors must obtain plans and specifications from Goodwyn Mills & Cawood LLC PLEASE NOTE: The estimated value listed for this project is for searchability purposes only and does not reflect the actual construction budget as determined by the owner. It should not be used for estimation purposes at this time. The project consists of installation of approx. 1,000 LF 8" ductile iron water main and related appurtenances. Construction of approximately 1,120 linear feet of 8" ductile iron water main, 6 and 8- inch valves, water service reconnections, fire hydrant assemblies, asphalt overlay, and related appurtenances in Altoona, Alabama. You can email your questions/comments to jeremy.lewis@gmcnetwork.com. Appropriate responses will be issued only to those items considered necessary by the Engineer via an addendum. No documents will be issued within 48 hours prior to bid opening. All bidders must comply with the President's Executive Order Number 11246 which prohibits discrimination in employment regarding race, creed, color, sex or national origin. All bidders must comply with title VI of the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti-Kickback Act and the Contract Workhours Act. The attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the Contract, Section 3, Segregated Facilities, Section 109 and E.O. 11246. The Owner reserves the right to waive any informalities, or to reject any or all bids, and to award the contract to the lowest, most responsive and responsible bidder. All bidders must comply with requirements of the Contractor's Licensing Law of the State of Alabama and be certified for the type of work on which the proposal is submitted. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. All Contractors preparing Bids for the referenced project shall submit a list of similar projects "successfully completed" in the last 5 years, having the same scope of work with construction cost similar to or greater than this project. All nonresident contractors preparing bids shall submit with the bid documents evidence of a current Alabama General Contractor's License, evidence (with original seal of the State of Alabama) of proper registration with the Alabama Secretary of State as a foreign corporation, and a Certificate of Good Standing as a Foreign Corporation from the State of Alabama Department of Revenue. Bids submitted by a nonresident contractor without these documents included will be rejected. Guarantee will be required with each bid for at least 5% of the amount of the bid filed in the form of a certified check, Bid Bond, or irrevocable Letter of Credit acceptable to the owner payable to the Town of Altoona. Bid Bonds shall include certification that the bonding company is listed in Circular 570 of the U.S. Treasury Department. The name, address, telephone number, and contact person for the bonding company shall also be included. No bidder may withdraw his bid within 60 days after the opening thereof. Bids may be held by the Owner for a period not to exceed sixty (60) days from the date of opening of bids for the purpose of reviewing the bids and investigating the qualifications of the bidders prior to awarding the contract. This project is being funded in part by CDBG Project No. SM-CE-PF-21-005. ADECA requires all entities participating in federally funded projects to be registered in SAM (System for Award Management). Prospective bidders must provide proof of active SAM status with their bid. The successful bidder will be required to submit 100% performance and payment bonds or an irrevocable "Letter of Credit" which is acceptable to the Owner. All bonds and letters of credit shall be for 100% of the contract price. Attention of Bidders is called to the license required by Title 34, Chapter 8, of the code of Alabama, 1975, and amendments thereto, relating to the licensing of General Contractors. No bid will be accepted from anyone, except a qualified Contractor, licensed by the State Licensing Board for General Contractors, unless otherwise required by the State Licensing Board. All bids shall be submitted in a sealed envelope bearing on the outside the name of the Bidder, Bidder's license number, license expiration date, category, address and name of the project. Envelopes containing bids must be addressed as follows, and delivered to "The Honorable Richard Nash, Mayor, Town of Altoona, 2844 Main Street, Altoona, AL 35952: 2022 CDBG WATER SYSTEM IMPROVEMENTS - CDBG PROJECT NO. SM-CE-PF-21-005." The Town of Altoona, AL is an equal opportunity employer and encourages the participation of women and minority owned businesses (OMBEs) and Section 3 qualified contractors in all project contract procurements. Richard Nash, Mayor Goodwyn Mills Cawood, LLC 2400 5th Avenue South, Suite 200 Birmingham, Alabama 35233 TEL (205) 879-4462 *You can email your questions/comments to jeremy.lewis@gmcnetwork.com. Appropriate responses will be issued only to those items considered necessary by the Engineer via an addendum. MBE (24.9%), WBE (6.9%)

Bid Results

Water / Sewer

$641,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Quantity Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
46
Bidding Soon
764
All Active Projects
362
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

January 6, 2023

img_map_placeholder

Multiple Locations, Altoona, AL


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 CDBG Water System Improvements Rebid

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.