Renovation of a mixed-use development in Memphis, Tennessee. Completed plans call for the renovation of a educational facility; and office development.

The Shelby County Board of Education will accept written proposals for: County Board of Education (COE) and Barnes Cooling Tower Replacements . Replace existing condenser tower pumps (2) and 1 system pump between the boilers with new starters with both. Questions or requests for clarification of technical issues and terms pertaining to this Bid must be submitted in writing via e-mail to LaQueeya Braxton at braxtonl@scsk12.org or LaJuanna Jones-Sulton at jonessultonlm@scsk12.org, by October 5, 2022 @ 2:00 PM CST PERFORMANCE AND LABOR BOND: The successful Bidder(s) will be required to submit a performance and/or labor bond, Cashier's or Certified Check in the amount of one hundred percent (100%) of the total estimated contract amount for each individual school location, as determined by SCBE and specified in the IFB, to ensure the satisfactory completion of the work for which a contract or purchase order is awarded that exceeds $100K. SCBE has set a Minority or Woman-owned Business Enterprises goal for Administrative Building (COE) 9.1% and Barnes Building 9.1% for this project, Administration Building (COE): 1. Replace exiting cooling tower for Administration building. 2. New tower to have more than one DD fan per cell with gantry for motor removal. 3. Provide new VFDs for tower fans on the roof and mount and wire a spare VFD for each fan. 4. Provide manual isolation valves in each pipe. 5. Install isolation valves in equalizer lines. 6. Replace both condenser water pumps. 7. All outside piping to be heat traced and weather/waterproof with metal jacket. 8. Replace three-way control valve in the mechanical room. 9. Building is to be in operation with minimal and coordinated down time. 10. Contractor is to install temporary hookups as needed for the condenser pipe. 11. Connect all controls to Siemens BAS server. 12. Demo and remove existing towers and piping as needed. 13. Installation shall follow latest local building codes. 14. Install P/T ports and drain valves in each pipe. 15. Modify Electrical as needed. 16. Tag each pipe with direction of flow. 17. Provide water balance report Barnes Building: 1. Replace exiting cooling tower for Barns building. 2. New tower to have DD fan with gantry for motor removal. 3. Provide new VFDs for tower fans on the roof and mount and wire a spare VFD for each fan. 4. Provide manual isolation valves in each pipe. 5. All outside piping to be heat traced and weather/waterproof with metal jacket. 6. Replace three-way control valve in the mechanical room. 7. Building is to be in operation with minimal and coordinated down time. 8. Contractor is to install temporary hookups as needed for the condenser pipe. 9. Connect all controls to Siemens BAS server. 10. Demo and remove existing tower and piping as needed. 11. Installation shall follow latest local building codes. 12. Install P/T ports and drain valves in each pipe. 13. Modify Electrical as needed. 14. Tag each pipe with direction of flow. 15. Provide water balance report.

Post-Bid

Office

$200,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
86
Bidding Soon
745
All Active Projects
337
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 11, 2022

November 1, 2022

February 1, 2023

img_map_placeholder

160 S Hollywood St, Memphis, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.