BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Memphis, Tennessee. Completed plans call for the renovation of a educational facility.

**As of December 22, 2022, this project has not yet been awarded. Anticipated award date is on January 23, 2023.** Mitchell High School and Gardenview Elementary School Chiller Replacements. Attention Perspective Bidders: The "Doing Business with MSCS" tab is now located at the bottom of the page of the MSCS website. Click on the link in order to access MSCS Bid''s and RFP''s Question Deadline 10/05/2022 at 2:00 PM CT Submitted in writing via e-mail to LaQueeya Braxton at braxtonl@scsk12.org or LaJuanna Jones-Sulton at jonessultonlm@scsk12.org SCBE has set a Minority or Woman-owned Business Enterprises goal for Mitchell HS 12.7% and Gardenview ES 12.7% for this project, Mitchell High School: 1. Replace both chillers for the main building. 2. Replace the chiller for the auditorium. 3. Chillers shall be provided to meet latest MSCS design guide. 4. Provide manual isolation valves for all chillers. 5. Provide motorized isolation valves to each chiller for the main building to prevent water flow when chiller is not operating. Install a bypass in the pipe. 6. All outside piping to be heat traced and weather/waterproof with metal jacket. 7. Connect each chiller to the new Siemens BAS server. 8. Demo and remove existing chillers and piping as needed. 9. Installation shall follow latest local building codes. 10. Install P/T ports and drain valves in each pipe and at the chiller. 11. Modify Electrical as needed. 12. Tag each pipe with direction of flow. 13. Provide water balance report. Gardenview Elementary School 1. Replace both chillers. 2. Chillers shall be provided to meet latest MSCS design guide. 3. Provide manual isolation valves. 4. All outside piping to be heat traced and weather/waterproof with metal jacket. 5. Connect each chiller to the Siemens BAS server. 6. Demo and remove existing chillers and piping as needed. 7. Installation shall follow latest local building codes. 8. Install P/T ports and drain valves in each pipe and at the chiller. 9. Modify Electrical as needed. 10. Tag each pipe with direction of flow. 11. Provide water balance report

Post-Bid

Educational

$400,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
28
Bidding Soon
398
All Active Projects
180
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2022

November 1, 2022

img_map_placeholder

Multiple Locations, Memphis, TN

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.