BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Albuquerque, New Mexico. Conceptual plans call for the renovation of a military facility.

NOTICE: This is a sources sought, not a request for proposal or invitation for bid. This notice does not obligate the Government to award a contract or otherwise pay for the information submitted in this request. The Security and Counterintelligence Office, Defense Threat Reduction Agency (DTRA), Kirtland AFB (KAFB) NM is upgrading the currently utilized LENEL access system. The current LENEL access system utilized by DTRA Albuquerque does not include three buildings (Bldgs 20451, 20423, and 37541.) This project will extend the overarching LENEL system to include these three locations. DTRA is looking to acquire the services of a certified LENEL Value Added Re-Seller (VAR) to complete the installation for the LENEL upgrade. Description of Work: 1. The Contractor shall conduct a construction Design Phase Plan to be included in the construction Security Plan, identifying areas where the LENEL access system will be installed and verify existing construction site conditions and obtain all required construction site measurements. Specifics for each building include: a. BLDG 20451: Determine the viability of existing doors, door jambs, gates and other areas for installation of 6 interior doors, 4 exterior doors, 2 pedestrian gates, 1 vehicle gate; and related conduit, wiring, and associated hardware; b. BLDG 20423: Determine the viability of existing doors, door jambs, gates and other areas for installation of 2 interior doors, 4 exterior doors, 1 pedestrian gate, 1 vehicle gate; and related conduit, wiring, and associated hardware; c. BLDG 37541: Determine the viability of existing doors, door jambs, gates and other areas for installation of 2 interior doors, 1 exterior doors, and related conduit, wiring, and associated hardware. 2. The contractor shall use and retain the experience of trained certified LENEL installers and technicians to complete the work. 3. The contractor shall use U.S. citizens to complete the work. 4. The Contractor shall conduct a review the parts/material for this installation currently on hand to determine if any additional items are need. DTRA has previously purchased LENEL material to complete this upgrade. 5. The Contractor shall perform comprehensive testing of functionality of equipment pre-purchased for the installation and identify and list deficiencies at the time of the test and inspection that may impact equipment and system performance. 6. The Contractor shall be responsible for all additional requirements for this project including conduit, wiring, and any additional items required to complete the installation. 7. The Contractor shall accomplish all work in accordance with the manufacturer's published specifications and installation instructions and design specification. 8. The Contractor shall provide the required Construction Project Work As-Built Drawings prior to terminating the Contract and prior to leaving the Construction Project Job Site. 9. The Contractor shall updated the System Security Plan (SSP) for the DTRA Albuquerque Badging System (DABS) 10. The Contractor shall obtain all required permits prior to starting construction project work and shall provide all permits to the Army Corps of Engineers (USACE) and Defense Threat Reduction Agency (DTRA) to include; Environmental, National Emission Standards for Hazardous Air Pollutants (NESHAP), Digging, Burn, etc. 11. The Contractor shall accomplish project work in accordance with the minimum requirements found in the USACE Specification Guide, Federal and Local Building Codes. The Contractor shall provide testing and service documentation demonstrating compliance with requirements. 12. The contractor shall include a warranty against all defects in material workmanship. All work shall be inspected and accepted by the KAFB. The work area shall be inspected for workmanship, completeness, and cleanliness. The Contractor shall be responsible to ensure all items meet code requirements. All work shall meet professional commercial standards. All applicable permits will be obtained. Material on Hand: 1. 3 x C9300-24U-A, CATALYST 9300 24PT UPOE 2. 1 x LNL-1100-S3, Input Control Module (Series three) 3. 340 x 277-2027-ND, CONN Grey Term Feed 4. 34 x 277-2038-ND, CONN Term Blk End Cover Gray 5. 17 x 277-2293-ND, Din Rail 35mm x 7.5mm Slotted 2m 6. 51 x 277-3241-ND, Conn Black Term Blk Feed Thru 7. 34 x 277-3243-ND, Conn Red Term Blk Feed Thru 8. 3 x C9300-DNA-A-24-3Y, DNA Advantage, 24-port, 3yr Term 9. 4 x C3560CX-DNA-A-8-3, C3560CX DNA Advantage 48-Port 3 yr Term 10. 3 x C9300-DNA-A-48, DNA Advantage 48-port 3 yr Term 11. 1 x FPO150-B100, PreWired Mercury, 8DR NET E6M 12. 7 x PWR-C1-1100WAC-P, 1100W AC 80+Platinum Config 1P/S 13. 1 x PRO-64RUP-64, Access Readers upgrade for Pro Systems 14. 2 x SWC-ADV, Onguard ADV Client Software License 15. 7 x c9300NM8X, Cisco 8 x 10GE Network Module 16. 3 x CAB-SPWR-30CM, Catalyst 3750X Stack PWr CBL 30 17. 3 x STACK-T1-50CM, 50 CM Type 1 Stacking CBL 18. 6 x PWR-C1-1100WAC-P/2, 1100 W AC 80+PlatinumConfig P/S 19. 9 x LNL-1320-S3, Dual Reader Interface Module 20. 8 x LNL-X2220, Intelligent Dual Reader Controller 21. 10 x LNL-X4420, Intelligence Dual Readers Controller 22. 1 x FPO150/250-3D8P2M8NL4E8M2, PreWired Mercury, 16DR NET E8M2 23. 8 x 12V 40ah, 12 V 40ah Battery 24. 10 x 909-MO, 909-MO Rocker Switch 25. 30 x HSS-1620, HSS Z-Bracket Kit 26. 17 x HSS-L2D-000, HSS-L2D Dual Alarm, Surface Mount Contact 27. 10 x HSS-SPO62, Spacers HSS L2S/L2d Seer 1 28. 3 x EN400, Heavy Duty Outdoor Electric Strike 29. 4 x M62, M62 Magnalock-12/24VDC 30. 1 x IK, M62 Maglock Kit 31. 9 x 1320-PWR, 16-2 OAS STR CMP (1000 ft per box) 32. 9 x 4351-BMS-REX-PIR, BMS-REX-PIR 1000 ft per box 33. 7 x 4352-RDR, OAS STR CMP Wht Jkt (1000 ft per box) 34. 4 x C9300-48U-A, Catalyst 9300 48-port UPOE 35. 4 x C3560CX-8PCS, Catalyst 3560-CX 8 Port PoE IP Base TAA 36. 30 x GLC-SX-MMD++=, 1000BASE-SX SFP transceiver module 37. 16 x GLC-LH-SMD ++=, M62 Magnalock-12/24VDC Location of Work: The construction sites are located on KAFB NM. Applicable NAICs Codes: 541512, 561621, 238210, 423610 Response Requirements: In response to this Source Sought publication, provide a Capability Statement package with a limit of 15 pages. Submissions should include pertinent information demonstrating your company's capabilities to independently accomplish the specific work described above. In addition, include a list of any similar projects completed in the last 5 years. Provide references or points of contact (POC) information related to recent associated projects. Include a detailed description/list of key personnel that would be assigned to manage projects for this type of work. For each individual, include details related to Professional Licensing and/or certifications. Other information can include general company data, current/potential business partnerships, core competencies, differentiators (unique capabilities), and POC information. The method of contractor selection has not been determined at this time.

Conceptual

Military

$95,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
18
Bidding Soon
335
All Active Projects
139
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.