Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 4, 2022 at 8:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Dover, New Hampshire. Contact the soliciting agency for additional information.
I. INTRODUCTION The City of Dover is requesting qualified vendors to submit pricing to provide all of our water treatment services for the cooling towers and a closed loop heating system. The term will be for one year with option to renew for two additional one year terms. Services include monitoring the ph levels and conductivity of the water that cools our compressors and also the automatic bleed control for the holding tank. General information and specifications are as follows. Submitted Rates will hold for one year beginning January 2023 and will be negotiated for the optional two year extensions. Rate increases IF ANY for year two and three will not exceed the Consumer Price Index (Boston). The contract pricing will be based on Time and Materials Only. Man hours paid under this agreement shall be only for production hours. II. GENERAL REQUIREMENTS The City of Dover reserves the right to waive any formality, informality, information and/or errors in the proposals submitted and the right to reject any or all proposals at its discretion and to accept the proposal which will be in the best interest of the City; or to purchase on the open market if it is considered in the best interest of the City to do so. Any questions or inquiries must be submitted in writing, and, in order to be considered, must be received by the Purchasing Agent (k.cragin@dover.nh.gov) no later than seven (7) calendar days before the Request for Proposals due date and time. Any changes to the Request for Proposals will be provided to all Proposers of record. No Late, Emailed or Faxed proposals will be accepted. III PROJECT REQUIREMENTS Requirements are to come once a month to the Dover Arena & the McConnell Center. The arena cooling tower operates all year where the McConnell operates approximately 8 months. Vendor will provide a report with information on the measurements they have taken including PH, conductivity, water clarity and any conditions they encounter that need addressing such as water levels and flow. The process by which current treatment is being obtained is through the use of Hydrocell NON-chemical treatment system. We are also offering the option of a chemically treated process in order to evaluate the two processes.
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2022
January 2, 2023
Multiple Locations, Dover, NH
Related To This Project
Dover, NH
--
Dover, NH
--
Dover, NH
Bid Date: Nov 01 2022
Dover, NH
Bid Date: Sep 22 2022
Dover, NH
Bid Date: Sep 22 2022
Dover, NH
Bid Date: Oct 27 2022
Dover, NH
Bid Date: Nov 03 2022
Dover, NH
Bid Date: Jan 30 2024
Dover, NH
Bid Date: Oct 20 2022
Dover, NH
Bid Date: Nov 08 2022
Dover, NH
Bid Date: Oct 03 2022
Dover, NH
Bid Date: Nov 09 2022
Somersworth, NH
Bid Date: Oct 20 2022
Greenfield, NH
Bid Date: Oct 20 2022
Hanover, NH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
