BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 7, 2025 at 7:00 PM

Updated November 8, 2025

Site work and paving for a road / highway in Hot Springs, Arkansas. Design plans call for site work for a road / highway; and for paving for a road / highway.

Plans call for interchange improvements for the Albert Pike-Airport project. A detailed scope is not available. As of November 7, 2025, this project is in the very early stages of project development for preconstruction. The department of transportation has funding allocated for project development in it's current 2023-2026 Statewide Transportation Improvement Program (STIP). This project is identified as Job 061645. A timeline for bidding and construction has yet to be announced.

Design

Roads / Highways

$100,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
37
Bidding Soon
476
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2026

Project location map

Albert Pike Rd, Hot Springs, AR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.