BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Fredericksburg, Virginia. Contact the soliciting agency for additional information.

Addendum 1 updates bidders instructions to submit paper bids during eVA conversion. Addendum to be returned with bid package. Payment will be made (in accordance with the Virginia Prompt Payment Act) within 30 days after receipt of valid invoice and verification of satisfactory goods received and/or completion of work. Invoices shall be submitted to the address listed below for all items completed within the designated billing period. The bid opening will begin promptly at the time indicated. At the start of the conference the VDOT Representative will conduct a roll call to identify the individuals participating on the call. Participants will be requested to provide their names, company and contact information during the roll call. If you are unable to access the teleconference at the scheduled time please contact the Contract Officer via email and a bid reading will be provided. The provisions of 2.2-4342 of the Code of Virginia, as amended, shall be applicable to the inspection of bids received. Any damage to existing utilities, equipment, facilities, finished surfaces, guardrail, curb and gutter, paved shoulders, drainage, mailboxes, driveways or any other state or private property resulting from negligent work related to the performance of this contract shall be repaired to the Commonwealth's satisfaction at the contractor's expense. Claims made by VDOT as a result of this work will be referred to the Contractor for handling. The Contractor shall have 72 hours to respond to VDOT and provide written documentation as to the Contractor's intended resolution. Resolution may include, but is not limited to, proof of remuneration of claim or proof of claim being turned over to the Contractor's insurance. VDOT may withhold payment from an invoice and/or from the final demobilization payment to the Contractor until the claim is resolved. Failure to properly respond to and resolve damage claims constitutes unsatisfactory performance and may result in a Procurement Complaint being filed which may result in termination of the contract.

Post-Bid

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
72
Bidding Soon
1,914
All Active Projects
771
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2022

November 30, 2022

img_map_placeholder

I-95, Fredericksburg, VA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.