BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 11, 2022 at 7:00 PM

Updated February 28, 2024

Site work and paving for a road / highway in King Hill, Idaho. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Constructing a three-inch overlay over the existing 26 feet wide pavement Please contact the Resident Engineer Megan Kautz P.e. (Lhtac) AT (208) 344-0565 or mkautz@lhtac.org for any design related questions. Est. Value Notes: $1,000,000 to $2,500,000 IDOT - Old Hwy 30; Old Oregon Trail Rd to E 54th S St *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. BID BOX LOCATION: 11331 W. CHINDEN BLVD, BUILDING #8, WEST LOBBY SLOT #4 (ORANGE) USPS DELIVERY ADDRESS: IDAHO TRANSPORTATION DEPARTMENT, ATTN: ADVERTISEMENT AND AWARD, PO BOX 40, BOISE, ID 83707-0040 FEDEX/UPS/DHL DELIVERY ADDRESS: IDAHO TRANSPORTATION DEPARTMENT, ATTN: ADVERTISEMENT AND AWARD, 11331 W. CHINDEN BLVD, BUILDING #8, BOISE, ID 83714 For the work of constructing a three-inch overlay over the existing 26 feet wide pavement. The following special provisions and all addenda issued supplement or modify the 2018 Idaho Transportation Department Standard Specifications for Highway Construction: 2022 Supplementals for the Idaho Transportation Department 2018 Standard Specifications for Highway Construction, 2020 Quality Assurance Manual, 2020 Quality Assurance Special Provision for State Acceptance (10/21/2019), 2021 Special Provision for 405 Superpave Hot Mix Asphalt (07/02/2021), April 2022 Standard Drawings, Title VI Special Provisions; FHWA-1273 Federal Aid Required Contract Provisions with supplement, and General Wage Decision ID220079. Federal-aid dollars were used during design and will be used for construction; therefore, Buy America is in effect for this project. Work will not start earlier than March 6, 2023 or later than August 31, 2023 and must be completed within 25 working days. Once started, work must continuously progress until completion. Return traffic through the work zone to normal operations during any planned or unplanned work stoppage lasting longer than 2 working days.

Award

Roads / Highways

$1,353,000.00

Public - State/Provincial

Paving, Site Work

32

7

7

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
34
Bidding Soon
349
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

March 6, 2023

Project location map

Old Hwy 30, King Hill, ID


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.