BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Akron, Ohio. Completed plans call for the renovation of a 15,345-square-foot educational facility.

Center for Precision Manufacturing Renovation General Contract Estimate: $3,650,000 Alternate 01: $1,690 Alternate 02: $23,000 Alternate 03: $2,536 The Work of the Project is defined by the Contract Documents and includes, but is not limited to, building envelope repair, new roof, exterior entry definition with new facade metal panels and windows at the southeast corner. Interior renovations including finishes, ceilings and new offices and restrooms. New systems for MEPT are included. The project also includes a Phase One enabling project that involves new electrical and mechanical/plumbing scope in the National Polymer Innovation Center and the Olson Research Center to be able to accept equipment currently housed within the 225 East Mill building. This is a single prime general contracting delivery. EDGE Participation Goal: 5% of contract. 0142-2533, 220005 Scope includes: Building envelope repair, new roof, exterior entry definition with new facade metal panels and windows at the southeast corner, interior renovation and reconfiguration including finishes, ceilings and new offices and restrooms. New systems including MEPT and other Work indicated in the Contract Documents. The building is a B-use group, construction class IIB of 15,345 SF. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: Building envelope repair, new roof, exterior entry definition with new facade metal panels and windows at the southeast corner, interior renovation including finishes, ceilings and new offices and restrooms. New and altered systems for MEPT. The project also includes a Phase One enabling project that involves new electrical and mechanical/plumbing scope in the National Polymer Innovation Center and the Olson Research Center to be able to accept equipment currently housed within 225 East Mill building. This scope will have separate plan reviews and permits. This work designed by GPD Group.

Post-Bid

Educational

$3,650,000.00

Public - City

Renovation

89

31

3

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
61
Bidding Soon
1,011
All Active Projects
390
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2022

December 19, 2022

img_map_placeholder

225 E Mill St, Akron, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.