BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Tucson, Arizona. Completed plans call for site work for a water / sewer project.

The work to be accomplished under the following specifications consists of the drilling, construction, and testing of two supply wells for the Metro Southwest Diablo Village water system in Southwestern Tucson, Arizona. The site is located on Ajo Way south of the Ryan Airfield (Figure 1 of the included Technical Specifications). The proposed drilling locations for supply wells designated as DV-3 and DV-4 are shown on Figure 2 of the included Technical Specifications. The cadastral locations for each well are listed below: DV-03 (15-12)18 BBB DV-04 (15-12)18 CBC The actual drilling sites will be staked by the OWNER prior to mobilization of the drill rig. The anticipated geology of the site is loosely to moderately consolidated basin fill sediments consisting of sands, gravels, silts, and clays. Lithologic logs for nearby exploration borehole Wildflower WP-1 Exploration Borehole are provided in Appendix A of the included Technical Specification. All work is to be completed in 120 calendar days from the date of Notice to Proceed pursuant to the Construction Documents and Technical Specifications prepared by Clear Creek Associates. Liquidated damages for late delivery will be assessed per the Pima Association of Governments Standard Specifications for Public Improvements, 2015 Edition with Amendments. BID BOND: Bids must be accompanied by an original bid guarantee of ten percent (10%) of the TOTAL BID amount. OWNER accepts the forms of bid guarantee provided in A.R.S. 34-201(A) (3). LICENSING: All bidders must hold a valid license issued by the State of Arizona Registrar of Contractors and maintain same throughout the duration of the contract term. Failure to maintain said license may be grounds for default of the contract and subsequent termination. Karah Wiseman; Project Coordinator at Smyth Industries IN WRITING TO: E-mail: kwiseman@smythindustries.com

Post-Bid

Water / Sewer

$2,700,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
11
Bidding Soon
278
All Active Projects
97
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2022

December 2, 2022

img_map_placeholder

Multiple Locations, Tucson, AZ

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.