BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for an educational facility in Tulsa, Oklahoma. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

OSU CHS ME Demo The following Bid Packages are Bidding: DEMO All bids are to be sealed and CLEARLY labeled by describing the project and indicating the package being bid, on the envelope as described in the Instructions to Bidders. A Bid Security, as stipulated in the bid documents, in the amount of 5% of the bid shall accompany the sealed proposal of each bidder if the amount of the bid exceeds $50,000. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays, and Holidays, before time set for opening bids, as well as bids received after time set for opening bids, will not be considered and will be returned unopened. All Bidders for this project are required to meet all qualification requirements as established in these bid documents. Upon receipt of an acceptable bid, the contract will be awarded within thirty (30) days after opening bids and the written contract executed within sixty (60) days thereafter. The Owner reserves the right to reject any or all bids or to waive any informalities or irregularities in the bidding. ) Contractor is to furnish manpower, materials, and equipment necessary, as required by the project schedule, including interim milestone dates, and to furnish additional crews, equipment, etc. and/or overtime required to maintain the schedule if Contractor falls behind due to their own fault or due to inclement weather. 2.) Contractor is responsible for field engineering, layout and field layout from benchmarks and base building control furnished by the Construction Manager. The Construction Manager shall provide one horizontal and one vertical control point and transfer of this point is the responsibility of the contractor. Rough-In requirements are to be dimensioned off of column lines as shown on the contract documents. 3.) Contractor shall furnish hoisting, material transport, and all material handling for the scope of this bid package. 4.) Contractor shall furnish pumping and dewatering as required for the scope of this bid package. Any performed must be done so as not to hinder any other trades’ work. 5.) Contractor will perform any saw cutting, patching, and removal of debris as required for the scope of this bid package. The Construction Manager must approve the quality of any cutting and patching work. 6.) Contractor shall furnish drinking water for its employees and its subcontractors’ employees for the scope of this bid package. 7.) Contractor shall include all remobilization operations required to complete the scope of this bid package. 8.) Contractor shall include temporary power for the scope of their work until building temporary power is provided. 9.) Contractor shall coordinate all material deliveries with the Construction Manager and shall have a representative on site to receive all deliveries of materials under the scope of work of this bid package. 10.) Contractor shall clean up his work in such a manner as to maintain safe working conditions on the project, including but not limited to excess material, lunch trash, and dirt and debris on streets and sidewalks. All trash generated from this Contractor’s work or its’ forces shall be removed by the Contractor’s own forces and Contractor’s equipment. Trash shall be placed in an on-site dumpster provided by construction manager. Any waste that requires special disposal such as concrete, pavement or hazardous waste will be disposed of by Contractor and not placed in the on-site dumpster. Debris placed in the dumpster must fit within the confines of the dumpster; otherwise it is the responsibility of this contractor to remove such debris from the project in an acceptable manner. If after a 24-hour notice Contractor fails to clean-up trash, then the Construction Manager may clean up the trash and the cost thereof shall be charged to the Contractor. 11.) Contractor shall submit to Construction Manager an emergency contact list containing information on field supervisory personnel and management personnel complete with phone numbers prior to commencing work on the project. 12.) Contractor’s field supervisory personnel shall attend weekly project coordination meetings while performing work on the site

Post-Bid

Educational

$180,000.00

Public - State/Provincial

Demolition, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
56
Bidding Soon
657
All Active Projects
305
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2022

January 9, 2023

img_map_placeholder

1633 Southwest Blvd, Tulsa, OK


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.