BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2022 at 7:00 PM

Updated January 25, 2024

Site work and renovation of a playground / park / athletic field in Bridgeton, Missouri. Completed plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

The City reserves the right to waive irregularities, reject any or all bids or to hold all bids for up to thirty (30) days, and to award the bid in the best interest of the City. SCOPE OF WORK The City of Bridgeton is accepting proposals from qualified licensed contractors to repair all damages associated with the fires at Matthews and Hellebusch Parks. This RFP invites companies to submit proposals describing the installation from planning to completion within the minimum criteria set by the City of Bridgeton. Matthews Park Restroom - Scope of Work: Remove all shingles, wood rood sheathing, wood roof framing, FRP wall panels, damaged plumbing fixtures, damaged toilet accessories, ceramic floor tile, 3 hollow metal doors, and remove damaged electrical items. Masonry walls will remain. They are to be power washed and damaged blocks replaced. Plumbing fixtures and toilet accessories that are undamaged will be salvaged and reinstalled. New wood trusses will be installed along with new 5/8" roof sheathing, architectural shingles, 1/2 " AC grade plywood ceiling in restrooms only, James Hardie cement board for gable ends and a new ridge vent. Furnish and install 032 vented aluminum soffit, drip edge, and wrap exterior fascia. No Interior walls will be painted with an epoxy paint, doors and frames will be painted along with gable ends, 2 vents will be cleaned and painted, and no painting in the plumbing chase. New Desco Granite Series flooring with 4" cove base will be installed in both restrooms. No flooring in the plumbing chase. New hollow metal doors to be installed with push/pulls, surface door closers, louver at bottom of restroom doors only, dead bolts with Schlage Keyway (keying by City) hinges with non-removable pins, kick plates, and new hollow metal door frame for plumbing chase only. Replace toilet accessories completely in south restroom. Reinstall salvaged toilet accessories in north restroom. 2 new family restroom signs. Replace 2 toilets and reinstall 1 salvaged sink and 1 drinking fountain. No new floor drains and hot water heaters.

Award

Playgrounds / Parks / Athletic Fields

$80,220.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
121
Bidding Soon
1,350
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2022

November 28, 2022

Project location map

Multiple Locations, Bridgeton, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.