BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Aurora, Colorado. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

** As of November 23, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The Fulton Park Renovation project involves the full renovation of Fulton Park. Improvements include: new inclusive playground with accessible surfacing, new equipment for 2 to 12 year old children, new concrete walkways, new site furnishings, irrigation improvements, new shade trees and other landscape improvements. Job Description. The project includes, but is not limited to the supply and installation of the following: Earthwork Site Preparation Protection of Existing Trees Erosion & Sedimentation Control Lighting & Electrical Pedestrian Paving, Curbing, Footings, Ramps Artificial Turf Crusher Fines Site Furnishings Trees, Sod, Native Seed and Soil Preparation Irrigation Coordination with Play Equipment, Rubber Surfacing & Shade Structure installers Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond made payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. Original bid bonds do not have to be mailed; however, each bidder should maintain the original on file should the City request it at a later time. Buyer's Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Question Acceptance Deadline 10/17/2022 05:00 PM EDT Bidders may make written inquiries concerning this ITB to obtain clarification of requirements. Written inquiries shall be emailed to: Angie Young, Senior Procurement Agent, at ayoung@auroragov.org AND Katie Thompson, Project Manager, at kthompso@auroragov.org. It is preferred that all inquiries be sent with the subject title: Fulton Park Renovation (5867A). Questions are submitted online No The estimated cost for this project is from $780,000.00 to $930,000.00.

Bid Results

Playgrounds / Parks / Athletic Fields

$1,139,387.00

Public - City

Outdoor Lighting, Paving, Site Work

29

15

19

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
69
Bidding Soon
971
All Active Projects
417
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2022

November 25, 2022

img_map_placeholder

To Be Determined, Aurora, CO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.