BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Clay Center, Nebraska. Completed plans call for the construction of a 25,123-square-foot municipal facility; and for site work for a municipal facility.

As of November 17, 2022 a general contractor has been selected. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to January 2023. Work under this contract includes all material, labor, tools, expendable equipment, utility and transportation services, and all incidental items necessary to perform and complete, in a workman like manner, the Work required for the new building and site improvements, including all Civil, Architectural, Structural, Fire Protection, Mechanical and Electrical Work, for the South Central Power District Clay Center Service Center. The project includes but is not limited to a new building and site improvements. Site paving, drives, lighting, utilities, seeding/sod, landscaping, grading, water retention per SWPPP requirement, etc. The building site is currently not occupied by the owner and will be turned over the contractor for the construction period as such. The exterior of the building includes but is not limited to standing seam metal roofs, metal wall panels, brick veneer, building insulations, metal flashings, gutters and downspouts, overhead sectional doors, and windows and doors both hollow metal. The interior spaces and building systems are as indicated in the construction documents. The new construction shall include but is not limited to all new HVAC systems, controls, equipment and appurtenances as indicated, plumbing includes domestic cold and hot water, sanitary sewer work, piping, plumbing fixtures, toilet accessories, fire protection systems, electrical improvements, power, lighting, electronics, windows, doors, hardware, roofing, insulations, flashings, sealants, paints, porcelain tile, toilet partitions, floor sealants, gypsum board, metal studs, concrete masonry, APC, toilet accessories, signage, etc. The project consists of approximate 25,123 SF of new building and site improvements. *Subcontractor bidding may be ongoing for select trades. Interested subcontractors should contact the awarded general contractor to check on available bidding opportunities.

Award

Municipal

$9,300,000.00

Public - City

New Construction, Site Work

67

6

19

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
16
Bidding Soon
237
All Active Projects
95
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2022

January 2, 2023

img_map_placeholder

31239 NE-14, Clay Center, NE

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.