BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Wichita, Kansas. Completed plans call for site work for a water / sewer project.

Sanitary Sewer I-135 Interceptor Relocation, Blake to Industrial (south of Harry, west of Hillside) 22W-13252 For comments that affect bid items and/or quantities: Noon Tuesday prior to bid opening. For questions and comments requiring clarification only: Noon Wednesday prior to bid opening. This is necessary so appropriate changes and responses can be completed before bidding. The work on these projects shall be completed within 520 (five hundred twenty) total for all projects working days from date of beginning work and in accordance with the plans and Standard Specifications. Working days will be charged as provided for in the Standard Specifications, once the work order is issued. The non-availability of material shall not prevent working days from being assessed. The Contractor shall read and fully comprehend every aspect of the contract provisions included in this bid proposal, prior to submitting a bid for the project. Any questions prior to bid submittal should be directed to James Wagner, Project Engineer, at (316) 268-4505 or jwagner@wichita.gov. The work on these projects shall be completed within 520 (five hundred twenty) total for all projects working days from date of beginning work and in accordance with the plans and Standard Specifications The work order on these projects shall be issued no later than 90 (ninety) or At Contractors Request calendar days after the date on which the contract for these projects has been awarded to the successful bidder or at the Contractors request to start earlier. Section 102.7, Equal Employment Opportunity, add the following: On State/Federal-aid contracts, Contractor is required to pay Davis-Bacon wages and meet the requirements of the Davis-Bacon Wage Act for the entire project, including non-participating work. Liquidated Damages shall be $1,500 per day past the allotted 500 days allowed for all projects. Acceptance and deposit of any check by BNSF does not constitute an agreement between BNSF and Licensee for the requested license. Owner reserves the right to conduct laboratory comparison of the test product with the submitted product Part A and B formulation using infrared spectrometry analysis.

Post-Bid

Water / Sewer

$5,950,000.00

Public - City

Site Work

3

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
19
Bidding Soon
215
All Active Projects
101
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.