BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Hamler, Ohio. Completed plans call for site work for a water / sewer project.

In general, the work consists of: the construction of a new 75,000-gallon, single-pedestal, elevated water storage tank and the necessary piping and accessories for the tower, the installation of fence and gravel pad around tower base, and the removal of the existing elevated water tank. Technical questions regarding the project should be e-mailed to the Project Manager, Christopher A. Mann (cmann@jheng.com), at Jones & Henry Engineers, Ltd. Engineer's Estimate is $1,380,000. Bids must be submitted on the forms bound herein, must contain the names of every person or company interested therein, and shall be accompanied by either a Bid Guaranty and Contract Bond in the amount of 100% of the amount bid with satisfactory corporate surety, or by a certified check on a solvent bank in the amount of not less than 10% of the amount of the Bid, subject to conditions provided in the Instructions to Bidders. The successful bidder will be required to furnish satisfactory Performance Bond and Maintenance and Guarantee Bond in the amount of 100% of the Bid. The Contractor shall be required to pay not less than the prevailing Davis-Bacon Wage Rates issued by the U.S. Department of Labor. Domestic steel requirements, as specified in the American Iron and Steel (AIS) requirements, a copy of the requirements is included in the Specifications. his project is subject to EPA Policy of Encouraging the Participation of Small Business Rural Access (SBRA) and Disadvantaged Business Enterprises (DBE) Utilization. Completed WSRLA forms must be included with Bids. Any Bid may be withdrawn prior to the scheduled closing time for receipt of Bids, but no bidder shall withdraw his Bid within 90 days after the actual opening thereof. The Owner reserves the right to reject any or all Bids, waive irregularities in any Bid, and to accept any Bid which is deemed most favorable to the Owner

Award

Water / Sewer

$1,193,900.00

Public - City

Site Work

11

15

11

8

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
46
Bidding Soon
893
All Active Projects
403
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2022

December 26, 2022

img_map_placeholder

To Be Determined, Hamler, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.