Site work for a water / sewer project in Hamler, Ohio. Completed plans call for site work for a water / sewer project.

In general, the work consists of: the construction of a new 75,000-gallon, single-pedestal, elevated water storage tank and the necessary piping and accessories for the tower, the installation of fence and gravel pad around tower base, and the removal of the existing elevated water tank. Technical questions regarding the project should be e-mailed to the Project Manager, Christopher A. Mann (cmann@jheng.com), at Jones & Henry Engineers, Ltd. Engineer's Estimate is $1,380,000. Bids must be submitted on the forms bound herein, must contain the names of every person or company interested therein, and shall be accompanied by either a Bid Guaranty and Contract Bond in the amount of 100% of the amount bid with satisfactory corporate surety, or by a certified check on a solvent bank in the amount of not less than 10% of the amount of the Bid, subject to conditions provided in the Instructions to Bidders. The successful bidder will be required to furnish satisfactory Performance Bond and Maintenance and Guarantee Bond in the amount of 100% of the Bid. The Contractor shall be required to pay not less than the prevailing Davis-Bacon Wage Rates issued by the U.S. Department of Labor. Domestic steel requirements, as specified in the American Iron and Steel (AIS) requirements, a copy of the requirements is included in the Specifications. his project is subject to EPA Policy of Encouraging the Participation of Small Business Rural Access (SBRA) and Disadvantaged Business Enterprises (DBE) Utilization. Completed WSRLA forms must be included with Bids. Any Bid may be withdrawn prior to the scheduled closing time for receipt of Bids, but no bidder shall withdraw his Bid within 90 days after the actual opening thereof. The Owner reserves the right to reject any or all Bids, waive irregularities in any Bid, and to accept any Bid which is deemed most favorable to the Owner

Award

Water / Sewer

$1,193,900.00

Public - City

Site Work

11

15

11

8

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Thermal Protection, Thermal Insulation, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furnishing Accessories, Waste Receptacles
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Potable-Water Storage Tanks
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Commissioning of Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping, Hydronic and Steam Energy Utilities, Steam Energy Distribution, Underground Steam and Condensate Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
47
Bidding Soon
930
All Active Projects
345
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2022

December 26, 2022

img_map_placeholder

To Be Determined, Hamler, OH

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Water Distribution System Improvements; Division A - Water Tower

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.