EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 8, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Orland Park, Illinois. Completed plans call for the renovation of a municipal facility.

The Village of Orland Park ("Village") is requesting bids for the repair and replacement of the existing soffit systems and exterior joint sealing at all (3) three Village Center campus buildings (Village Hall, Civic Center and Franklin Loebe Center) as well as the replacement of fogged glazing units at the Village Hall only. ("Project"). Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % Buyer's Requirements General Requirements - Insurance Required - Prevailing Wage Required Question Acceptance Deadline 10/14/2022 01:00 PM EDT Questions are submitted online Yes

Award

Municipal

$2,524,470.00

Public - City

Renovation

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 08 - Openings

Division 08 - Openings

Glazing, Louvers and Vents
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
170
Bidding Soon
2,150
All Active Projects
1,032
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2022

April 15, 2023

img_map_placeholder

14700 Ravinia Ave, Orland Park, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Village Center Soffit Repairs, Glazing Replacement and Exterior Joint Sealing

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.