Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work and new construction of a development in Coeur D Alene, Idaho. Completed plans call civil work for a conservation development.

02 41 00 - Demolition 02 41 19 - Selective Demolition 03 00 00 - Concrete 26 00 00 - Electrical 31 00 00 - Earthwork 33 00 00 - Utilities The Coeur d'Alene Nursery grows and distributes tree seedlings for reforestation activities throughout the western United States. This project replaces existing hoop greenhouses with steel framed polycarbonate greenhouses, as depicted in the contract documents. C- 2 Project Location The project is located in Coeur d'Alene, ID at 3600 W Nursery Rd. C- 3 Project Magnitude Government Cost Estimate, per FAR 36.204, is between $5,000,000 and $10,000,000. C-4 Government-Furnished Property Government-Furnished Property is limited to exiting lights. In the event the number of existing lights salvaged is less than those shown on the construction drawings, supply by the Nursery of the same or equal lights to make up the difference for contractor install. C- 5 Drawings See Section J for the listing of Drawings that are incorporated into this solicitation. C-6 Schedule Phase 1 completion date is November 1, 2023. Phase 2 completion date is 11/01/2024. Please see J-4 attachment, specification section 01 1000, 1.2.C. The phasing and timing of work, including the option item for the West Range, is planned in order to keep each half not affected by construction in production of tree seedlings. Work Hours: All work during the period of performance shall be performed between 7:00 am to 5:00 pm, Monday through Friday, with the exception of Federal Holidays (see below for holiday schedule). Any work performed outside of this timeframe shall be approved by the COR prior to start. Any work outside of daylight hours shall be accompanied by adequate lighting provided by the contractor. Federal Holidays Observed: Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, New Year's Day, Martin Luther King Day, President's Day, Memorial Day, Independence Day, Christmas Day, Juneteenth, and any other day specifically designated by the President of the United States. All questions must be submitted to the CO no later than Friday October 7, 2022!

Post-Bid

Conservation and Development

$10,000,000.00

Public - Federal

Demolition, New Construction, Site Work

73

24

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
19
Bidding Soon
329
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2023

April 17, 2023

Project location map

3600 Nursery Rd, Coeur D Alene, ID

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed