Renovation of an educational facility in Denver, Colorado. Completed plans call for the renovation of a educational facility.
The Science Building Compressor Replacement project will include the replacement of one (1) failed Fu Sheng BSR 413 screw compressor with a new Hanbell RC2-55B compressor, install five (5) Variable Frequency Drives (VFDs) to replace existing line-to-line starters, and install nine (9) new Electronic Expansion Valves (EXVs) and upgradeable EXV controllers to replace failing Thermal Expansion Valves (TXVs). Compressor #1 replacement: Compressor 1 has failed and needs to be replaced. Order all new parts that are required compressor replacement scope Provide and install one (1) new Hanbell RC2-55B compressor to replace existing Fu Sheng BSR 413 screw compressor Disconnect the discharge & suction piping as well as all the electrical wiring to this compressor Unbolt & remove the existing mechanically locked-up (failed) Fu sheng screw compressor Bring the new Hanbell screw compressor up to the roof in the freight elevator Laydown plywood over roof to transport unit from elevator to chiller and rig it into the unit Mount compressor on new isolation mounting pads. Re-pipe the discharge and suction piping to fit to the new compressor Reconnect all the electrical wiring to the new compressor Add MPV valve for low differential start Use nitrogen to pressurize the refrigerant system to check for any leaks Once it is proven to be leak free the evacuation process will begin after the compressor oil has been added Once the vacuum reading in the system is below 500 microns charge the system with new R134 Refrigerant to be supplied by the Auraria Higher Education Center The old compressor will be removed from the roof All oil must be removed and recycled per EPA guidelines Connect new compressor to new VFD (see below) Start-up the new compressor Re-install existing Refrigerant charge in the system then log the compressor operation and go over its operation with the maintenance staff Advise if additional refrigerant is required Clean up the job site. Remove all tools, materials, rigging, etc. VFD scope: Compressors relay on a Line to Line start which causes high electrical demand loads and increases wear on equipment. New VFDs to serve has soft-start and provide future part load controls. Order all new parts that are required for VFD retrofit scope, Provide and install five (5) ABB or Yaskawa VFD to Compressors 1, 2, 5, 7 and 8 rated for the full load amperage of the compressors Provide and install Cool blue filters, line reactors and end caps Remove existing compressor starters Locate new VFDs in existing electrical enclosures or on nearest available wall space EXV Scope: Existing TXVs on the 9 refrigeration circuits are aging and replacing with EXVs will provide improved control and reduce repair expenses on the existing TXVs. Provide and install nine (9) Sporlan EXVs Provide and install nine (9) EXV driver boards On each circuit, Isolate existing piping, transfer refrigerant from piping to system side Remove old TXV, provide and install new EXV Leak test, evacuate and transfer charge back to piping side Install EXV Driver Board, electrical supply power and temperature controls for standalone EXV operation Set up EXVs to operate to meet existing plant controls Date Email Questions Due October 13, 2022 at 5:00PM Anticipated Contractor Start November 1, 2022 Anticipated Construction Start/Finish 11/1/2022 - 6/30/2023
Post-Bid
Educational
$600,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2022
November 1, 2022
1156 7th St, Denver, CO
Related To This Project
Denver, CO
Bid Date: Nov 29 2022
Denver, CO
Bid Date: Oct 20 2022
Denver, CO
--
Denver, CO
Bid Date: Oct 27 2022
Denver, CO
Bid Date: Nov 04 2022
Denver, CO
Bid Date: Nov 08 2022
Denver, CO
Bid Date: Dec 01 2022
Denver, CO
Bid Date: Jul 08 2022
Denver, CO
Bid Date: Oct 20 2022
Denver, CO
Bid Date: Oct 26 2022
Denver, CO
Bid Date: Sep 26 2022
Denver, CO
Bid Date: Sep 07 2022
Denver, CO
Bid Date: Aug 17 2022
Denver, CO
--
Denver, CO
Bid Date: Sep 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.