BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Low Point, Prince Edward Island. Completed plans call for site work for a water / sewer project; for the construction of a municipal facility; and municipal facility.

The work consists of the furnishing of all materials, labor, and equipment necessary for the Lennox Island First Nation (LIFN) Wharf Expansion located at Lennox Island, PE. In general, work under this contract will consist of, but will not necessarily be limited to, the following: - Construction of a new Berlin Wall wharf system. - Construction of a new sheet piling and armourstone berm boat slip adjacent to the existing sheet pile wharf structure. - Construction of a new finger pier complete with concrete deck and cap beams on steel piles. - Harbor dredging, to the limits as indicated on the Plans. - Storage and drying of dredge material for re-use to construct new parking area. - Construction and removal of temporary surcharging of the parking area for a period of time not less than that indicated on the plans and specifications. - Supply and installation of mooring cleats, wheel guard, wheel guard blocking, fenders, ladders and associated hardware for new construction. - Supply and installation of all armor stone, granular material and hot asphalt pavement, and all associated excavation. - Supply and installation of water, sanitary, and storm drainage systems. - Re-location of existing building to location shown on the Plans. - Construction of new washroom and electrical building. - Electrical system upgrades as described on the Plans complete with coordination and tie-ins to the existing electrical utility service. - Relocation of the existing fuel tank complete with new concrete slab, new precast concrete containment system, and all necessary electrical and/or mechanical hook-ups. - Supply and install new winch system. - Other items as indicated on the Plans and Specifications. Electronic documents are available at https://www.princeedwardisland.ca/en/tenders

Post-Bid

Water / Sewer

$4,000,000.00

Public - State/Provincial

New Construction, Site Work

39

19

8

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
14
Bidding Soon
170
All Active Projects
57
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2022

January 17, 2023

img_map_placeholder

2 Eagle Feather Trail, Low Point, PE

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.