BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in San Jacinto, California. Completed plans call for site work for a road / highway; for paving for a road / highway; for the construction of a water / sewer project; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

**As of April 02, 2024, this project has not yet been awarded. The Project is expected to be awarded on April 03, 2023 during the Board Meeting.** Liquidated Damages: $1500 per day Estimated Bid Value: $28 -$33 Million Project Duration:730 days Online Q&A: Yes Q&A Deadline:02/08/2024 5:00 PM (PST) Contact Info: Jennifer Morgenstern 951-928-3777 x4434, morgensj@emwd.org Under these Specifications, the Contractor shall furnish all labor, material, and equipment for construction of the complete and operable Groundwater Treatment Facility in accordance with these specifications and contract drawings. The work generally consists of the following: Site Grading and Appurtenant Site Work including, but not limited to: existing chain link fence demolition; tree removal as required; AC pavement removal; clearing and grubbing as required; rough and finish grading; import and/or export material as required; vegetation removal as required; temporary fencing; site AC paving and class II base; driveways, curb, gutter and sidewalks; masonry block perimeter wall and steel gates; motor operated site access gate; pedestrian gates; monument walls; drainage improvements, catch basins and storm drain inlets; preparing and implementing SWPPP; and miscellaneous on-site related work. Chemical Building with Electrical Room including, but not limited to: reinforced concrete foundation and slab; equipment and tank foundations; walls (exterior and interior); roof structure and parapet wall; windows; safety equipment; walk doors; rolling doors; fans and louvers; air conditioning units; air handlers; ventilators; ductwork; building fire suppression system; floor and roof drains; roof openings; painting and finish work; architectural treatments; corrosion protection coatings; exterior chemical sump; and miscellaneous building related work. Mechanical Work and Treatment Equipment including, but not limited to: furnishing, delivery and installation of treatment vessels, chemical storage and feed systems; mechanical process piping; surface wash pumps, pipe supports; isolation valves; motor operated valves; control valves; magnetic flow meters; air valves; start-up and commissioning; demonstration and training; and other miscellaneous work. Backwash Pump Station and Recycle Tank including but not limited to backwash transfer pump station and bolted steel tank including all pump station improvements and equipment; all process mechanical improvements (pumps, pipe, valves, and appurtenances); all mechanical improvements; foundation including over-excavation, backfill, and compaction, pressure testing, disinfection and startup as specified; and other related work. Pipeline Work and Equipment including but limited to: connections to existing pipelines; conveyance piping; facility process and inter-process piping; drain and sewer piping; backwash overflow piping; blow-offs and drain valves; air valves; pipe supports; fire hydrants; sampling ports; sample lines; chemical piping; couplings; reinforced concrete encasements; potholing of existing utilities; trenching and backfill; trench sheeting, shoring, and bracing per California Labor Code; import of backfill material; painting and coating; hydro-static testing, miscellaneous testing, chlorination/disinfection and field start-up and testing. Other Details Funding for this project has been provided in full or in part through an agreement under the U.S. Department of Treasury, American Rescue Plan Act (ARPA) forming the Coronavirus State and Local Fiscal Recovery Funds (SLFRF) program between the City of Murrieta (City) and Eastern Municipal Water District (District). By entering into a contract with the District, the Contractor and subcontractors shall comply with all the federal funding requirements whether or not any such requirements are expressly delineated in the Contract Documents *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The contract work site is located in the City of San Jacinto within District-owned property. The address of the facility is as follows: 1191 Hewitt Street, San Jacinto, CA Contractor shall provide all equipment, materials, and labor, and required to place into service a fully configured, integrated, and operational instrumentation and control system as indicated on the Drawings and specified herein. B. Design, fabricate, coordinate, install, calibrate, and test the instrumentation and control system to provide proper operation and to interface with related equipment and materials. C. Furnish and install auxiliary and accessory devices necessary for system operation or performance and to interface with equipment specified herein and in other Sections of these Specifications.

Award

Water / Sewer

$24,962,333.00

Public - County

New Construction, Paving, Site Work

180

37

38

7

Subscribe For Documents

84 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
86
Bidding Soon
1,577
All Active Projects
728
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

May 6, 2024

img_map_placeholder

1191 S Hewitt St, San Jacinto, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.