BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in American Canyon, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

GENERAL WORK DESCRIPTION The Project consists of water replacement and pavement rehabilitation at Knightsbridge Way from Elliott Drive to Danrose Drive. The pavement rehabilitation method is asphalt grind and inlay/overlay and cold in-place recycling on Knightsbridge Way and asphalt grind and inlay on all Cul-de-Sac Streets. Work includes, but is not limited to, distribution of public notices, mobilization, traffic control, storm water pollution prevention, curb ramp upgrades, asphalt grind and inlay, cold in-place recycling, asphalt concrete base repair, adjusting utility covers to grade, reinstallation of survey monuments, signage and striping, abandonment of existing water main and water valves, installation of new water main and water valves, installation of water services and all appurtenances, hydrant improvements and all appurtenances, testing of new water installation on Knightsbridge Way in American Canyon. This project is funded by the Napa Countywide Sales Tax Measure T and State SB1/RMRA. The Engineer's Estimate for the Project is $ 2,075,000. Prevailing wages are required on this Contract. The ENGINEER of the California Department of Industrial Relations determines the general prevailing wage rates. The City Council reserves the right to reject any and all proposals, to waive any irregularities, and to award the contract to other than the lowest Bidder. No Bidder may withdraw their Contract Proposal for a period of sixty (60) days after the bid opening. Copies of the CONTRACT DOCUMENTS may be examined or obtained at the stated address herein. For general information, call (707) 647-4559. For technical information, e-mail Ron Ranada, Senior Civil Engineer, at rranada@cityofamericancanyon.org Technical questions and Requests for Information will not be accepted after 1:00 p.m. on Thursday, October 31, 2024. The Contractor shall execute required documents within seven (7) calendar days after the Notice of Award; shall begin work within five (5) calendar days of issuance of the Notice to Proceed; and shall complete work within sixty (60) working days of issuance of the Notice to Proceed

Bid Results

Roads / Highways

$2,035,773.00

Public - City

Paving, Site Work

23

7

31

8

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
50
Bidding Soon
1,776
All Active Projects
766
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2024

January 6, 2025

img_map_placeholder

Multiple Locations, American Canyon, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.