Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Greeley, Colorado. Contact the soliciting agency for additional information.
Weld County is accepting bids from qualified contractors to furnish all labor, equipment, supplies, and material as necessary for the Weld County Courts Holding Cabling Project, as stated in this Invitation to Bid. Weld County will award the bid to the contractor/vendor with the best offering deemed most advantageous to the County, price/cost being the primary consideration. The determination of whether the bid is acceptable and meets the minimum requirements of the solicitation is solely within the discretion of the County. Overview: Weld County is requesting the cabling at the Weld County Courts Holding facility. The project includes a total of 48 category 6 cables (Color BLUE) from a data closet to the specific locations in the same building, on the same floor. One (1) - 24 strand Corning Single Mode fiber optics using LC connectors utilizing required labelling is to be ran and installed from the courts holding basement data closet to the 3rd floor data center. All associated patch panels and pathways are to be verified and provided by the contractor. A total of One (1) 19' rack, patch panels, ladder rack and all other data closet equipment as specified is required to be installed in both the courts holding basement data closet. Patch cables (Color GREEN) at the specified amount in the details section are required prior to signoff. Specific details will be provided during the mandatory walk-through. The project is considered an all-inclusive cabling turnkey solution. Building electrical diagrams will be provided at the mandatory walk-through. Contractors are to furnish all labor, equipment, supplies, and material as necessary for the copper, fiber, data closet and all other components of the installation project. The project is to include the installation of specified cabling per the identified materials in the specification sheet. The installation will use industry standards in addition to requirements listed in this bid. Access into county facilities will be granted via escort and facility sign in will be required. All cabling test results, and as-built engineering documents are to be provided in both physical hard copy and electronically 30 days from project completion. There shall be a warranty for all materials and labor for a period of not less than one full year after the work has been accepted by the County. This in no way limits or reduces the warranty offered by any manufacturer of material or equipment used in maintenance or repairs. All dry wall and drop ceiling penetrations are to be conducted by the contractor. Core drills if required will be performed by Weld County. Surface mounts will be provided and cabling in surface mounts will be pulled, terminated and tested by the contractor. J boxes, Arlington loops, and additional associated materials are to be installed by the contractor. Jack termination labelling per Weld County requirements are to be completed and test results provided prior to signoff. All modular RJ's to fully populate a patch panel must be supplied, meaning if a jack is not punched down, the patch panel should not be left empty, and a RJ should be placed in all slots. Copper Cable and Pathway Requirements: (QTY 48 cables requested) Modular patch panels itemized in specification section for all cables are required. CommScope 7504 Cat 6 Blue Cable All terminations must be tested to 250 MHZ and test sheets must be bound and given to technical services for future reference. All test documentation shall be delivered in hard and soft copy. Test documentation will include build out floor plan and cable test results. All testing must be done with company owned equipment and Corning certified for fiber. Copper cable locations and other requirements will be handed out at the mandatory pre-bid meeting. All cable runs will be home run from the distribution frame to each work area. Bridge taps and splices are not permitted as part of the horizontal cabling. Grounded cabling is not required .90 Meter maximum horizontal cable length. Provide neat cable management in the computer room. Commscope High Density Modular Patch Panels P/N 1375292 (2U-48) will be utilized for Data Closet Terminations Commscope SL110 Series Modular Jack to be utilize in conjunction with the Patch Panel for Data Closet Termination. All patch panel Jacks must be left populated even if a cable is not terminated. All ports in all installed patch panels must have a modular jack installed. All patch panels and cables must be labelled. All cables must be pulled to their final location. If conduits or cut outs are not supplied, or furniture mounting is required, the completion of the cable pull must be completed as requested. Provide support for cabling throughout the facility via J-hooks/Arlington loops or other similar means. Assure a ANNSI code and other code requirements are met. Assure all pathways are properly sleeved. Pathways and/core drills may be required and should be included as part of the requirements of the project. Fiber Installation Requirements: One (1) - 24 Strand Single Mode fiber route as specified is required All fiber optics strands are to be terminated into the Data Closets utilizing the fiber enclosures, bulkheads and LC connectors specified. This is a turnkey solution. All necessary materials and labor will be provided by the contractor company. Install, splice, terminate, and test Single Mode Coring fiber on both ends of each fiber run as specified. As-builds, in both hard and soft copy, to be provided 30 days after completion. Fiber test results, in both hard and soft copy, to be provided 30 days after completion. All equipment used for testing must be certified and calibrated within the previous 365 days. In order to maintain the optical fiber's performance, the following installation practices shall be followed: All fiber must be Corning Fiber and all terminations will be LC connections. Do not exceed the recommended pulling tension. Do not exceed the recommended minimum bend radius. A slack loop of 25' shall be left in each Data Closet. Any parts, components, subassemblies, or materials not specified, but necessary for a complete and functioning system, must be furnished as part of the finished product. No additional allowances will be made for items omitted from the specifications. Data Closet and Rack Requirements: Provide One (1) 19" racks and associated cable management and ladder rack as specified. Provide ladder rack and associated equipment. Provide appropriate and required equipment for cable bend radius when water falling into the rack. Provide fire caulking in all required locations. Provide appropriate support. Product Specifications: Jack Specs: Part number UNJ 600 GY Faceplates: Part number M10L-262 Part number M12L-262 Part number M14L-262 Cubicle Furniture Faceplates Blank Faceplates Security hardware (IE; Screws, etc.) Patch Panels: (QTY 1 Fully populated 48 port patch panel) Commscope High Density Modular Patch Panels P/N 1375292 (2U-48) will be utilized for Data Closet Terminations Commscope SL110 Series Modular Jack to be utilize in conjunction with the Patch Panel for Data Closet Termination. P/N 1375292 (2U-48) Fiber Optics: Corning Fiber: 024ZU4-T4F22D20 Closet Connector Housing: CCH-04U Closet Connector Housing Panels: CCH-CP12-A9 Splice Closure SCG-8C18-01 Patch Cables: 48 (1) foot UNC6-GR-1F (Green) 24 (3) foot UNC6-GR-3F (Green) 24 (5) foot UNC6-GR-5F (Green) 10 (25) foot UNC6-GR-25F (Green) 10 (50) foot UNC6-GR-50F (Green) Copper Labeling: Cables to be labeled on both ends per the specified Weld County standard. This will be provided after the bid award. Racks and Cable Management None requested Additional Jacks required: (Above and beyond cabling requirements) 24 - Part number UNJ 600 BLK Bid Delivery to Weld County: Email. Bids may be emailed to: Enter IT Contact Email. Emailed bids must include the following statement on the email: I hereby waive my right to a sealed bid. An email confirmation will be sent when we receive your bid/proposal. Purchase Type One Time Only- Delivery Date:TBD Question Acceptance Deadline 02/21/2023 12:00 PM EST Questions are submitted online: No Please call Aleksei Churyk or Charles Simons at 970-400-2555 or 970-400-2602 Number if you have any questions. General Requirements - Contractors License Required - Installation Required - Insurance Required - Local Service Required - Warranty Information Required Award Requirements - All or None Award
Post-Bid
Municipal
$50,000.00
Public - County
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 28, 2023
March 28, 2023
1401 N 17th Ave, Greeley, CO
Related To This Project
Greeley, CO
Bid Date: Oct 21 2022
Greeley, CO
Bid Date: Oct 21 2022
Greeley, CO
Bid Date: Oct 21 2022
Greeley, CO
Bid Date: Oct 17 2022
Greeley, CO
Bid Date: Oct 13 2022
Greeley, CO
Bid Date: Oct 26 2022
Greeley, CO
--
Greeley, CO
Bid Date: Oct 04 2022
Greeley, CO
--
Greeley, CO
Bid Date: Sep 01 2022
Greeley, CO
Bid Date: Oct 21 2022
Greeley, CO
Bid Date: Oct 21 2022
Greeley, CO
Bid Date: Oct 27 2022
Greeley, CO
Bid Date: Nov 17 2022
Greeley, CO
Bid Date: Mar 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.