BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a stadium in Reno, Nevada. Completed plans call for site work for a stadium.

This is a prevailing wage project. Replace existing Lawlor Events Center 25kV feeder with new feeder. Remove PMS 25-9 and replace PMS 25-8 with a single larger switch and connect to Sports Medicine, East Stadium Lighting and substation transformer. Estimated Cost Range: $300,000 - $400,000 Liquidated Damages: $500/day All personnel installing 25kV terminations shall be certified to perform the work. Proof of certification is required to be submitted to UNR. Work on Lawlor Events feeder will not be available to complete until after basketball season in March 2023. The contractor will be responsible for back up generator and fuel for Sports Medicine Building during rework of North Substation. Commercial General Liability, Business Automobile Liability, Workers' Compensation, and Builders Risk Insurance will be required. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "November 28, 2022" and shall be fully complete by "June 2, 2023." Question Cutoff Date: 10/20/2022 08:00 PM (ET) The work of the contract involves but is not limited to the installation of the following. 1. Demolition of medium voltage cable. 2. Demolition of above ground raceway systems. 3. Demolition of existing pad mount 25kV switch. 4. Furnish and install contractor furnished medium voltage conductors in EXISTING raceway systems. 5. Termination & splices of medium voltage conductors. 6. Electrical Systems testing and commissioning. Estimated Cost Range: $300,000 - $400,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Arenas / Stadiums

$400,000.00

Public - State/Provincial

Site Work

7

14

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
30
Bidding Soon
485
All Active Projects
204
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 3, 2022

November 28, 2022

June 2, 2023

img_map_placeholder

1664 N Virginia St, Reno, NV


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.