BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Pocatello, Idaho. Completed plans call for the renovation of a educational facility.

A. The Work of Project is defined by the Contract Documents and consists of the following: 1. Work includes the demolition and removal of existing heating-only rooftop mounted air handler. The unit is to be replaced with two new 28-ton packaged DX cooling rooftop units with hot water heating coils. Some duct work and piping alteration will be necessary and additional electrical service will be required. Structural reinforcement will be required to accommodate the new distribution of weight. Six destratification fans will be added to assist with the distribution of heating in the winter. Lastly, upgraded DDC infrastructure will be included. B. Type ofContract: 1. Project will be constructed under a single prime contract per the Division of Public Works Fixed Price Construction Contract between Owner and Contractor. For DPW Project 21664 Replace Chiller, Frazier Hall, Idaho State University, Pocatello, Idaho A description of the work for this project can be summarized to include demolition and removal of existing 20 ton chiller (qty. 1 ) and associated primary pump, complete installation of new similarly sized chiller and pump, upgraded DDC infrastructure associated piping and electrical work. Demolish and remove existing outdoor condensing units, refrigerant piping and indoor DX coils. Complete installation of new similarly sized outdoor condensing units, refrigerant piping and indoor coils, upgraded DDC infrastructure, associated piping and electrical work. Base scope work also includes correcting a deficient condition from a previously completed project. This includes correcting piping connections at ten coils located throughout the building (switching the hot and chilled water piping connections at the 4-pipe fan coil units) and installing new autoflow control devices at the hot and chilled water coils on each. Alternate 1 involves adding a second chilled water primary pump, associated piping and electrical work A bid bond in the amount of 5% of the total bid amount, including any add alternates, is required. A Public Works Contractor's License for the State of Idaho is required to bid on this work.

Award

Educational

$371,200.00

Public - State/Provincial

Renovation

12

11

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
4
Bidding Soon
92
All Active Projects
41
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2022

December 29, 2022

img_map_placeholder

735 E Carter St, Pocatello, ID

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.