Site work and paving for a road / highway in Reedley, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Reedley Alley Paving 2020 The work includes, in general, alley excavation, pave dirt alley ways, tree removal, installation of ADA compliant driveway approaches, sidewalk, valley gutter, and minor storm drain items. The contractor shall prepare the bid in accordance with the following schedule of improvements: Stage 1: Utilities Work includes installation minor storm drain items and fire hydrant spool and testing at various locations per plan. Work includes construction of curb, gutter, driveways, valley gutter, removal and construction of new HMA and Class II Aggregate Base section with subgrade preparation. Split the reconstruction of this alleyway and driveways into two separate stages. First, the western half of the alleyway would be closed for the reconstruction while maintaining access to the eastern units from Ponderosa Avenue. Upon completion, the eastern half of the alleyway would be closed and reconstructed while maintaining access to the western units from Columbia Avenue. Stage 3: Alley 2 Between B and C Streets from 10th to 11th and Alley 3 Between D and E Streets from 9th to 10th Work includes construction of curb, gutter, driveways, valley gutter, removal and construction of new HMA and Class II Aggregate Base section with subgrade preparation. Stage 4: Alley 4 Between D and E Streets from 12th to 13th and Alley 5 Between D and E Streets from 13th to 14th Work includes construction of curb, gutter, driveways, valley gutter, removal and construction of new HMA and Class II Aggregate Base section with subgrade preparation. Stage 5: Alley 6 Gum Avenue from East to Sunset Avenue Work includes construction of curb, gutter, driveways, valley gutter, removal and construction of new HMA and Class II Aggregate Base section with subgrade preparation. Stage 6: Alley 7 Between Early and Duff Avenues from Sunset to Columbia Work includes construction of curb, gutter, driveways, valley gutter, removal and construction of new HMA and Class II Aggregate Base section with subgrade preparation. Stage 7: Alley 8 Between E and F Street from 15th to East Avenue and Alley 9 Between F and G Streets from 16th to East Avenue Work includes construction of curb, gutter, driveways, valley gutter, removal and construction of new HMA and Class II Aggregate Base section with subgrade preparation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$804,956.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 27, 2022
November 28, 2022
Multiple Locations, Reedley, CA
Related To This Project
Reedley, CA
Bid Date: Nov 07 2022
Reedley, CA
Bid Date: Nov 01 2022
Reedley, CA
Bid Date: Dec 01 2022
Reedley, CA
Bid Date: Dec 01 2022
Reedley, CA
Bid Date: Dec 01 2022
Reedley, CA
Bid Date: Dec 01 2022
Reedley, CA
Bid Date: Nov 29 2022
Reedley, CA
Bid Date: Nov 29 2022
Reedley, CA
Bid Date: Oct 18 2022
Reedley, CA
Bid Date: Oct 18 2022
Hanford, CA
Bid Date: Sep 30 2022
Ukiah, CA
Bid Date: Sep 06 2022
Santa Rosa, CA
Bid Date: Nov 10 2022
San Jose, CA
Bid Date: May 18 2020
Yorba Linda, CA
Bid Date: Oct 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.