BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Reedley, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reedley Alley Paving 2020 The work includes, in general, alley excavation, pave dirt alley ways, tree removal, installation of ADA compliant driveway approaches, sidewalk, valley gutter, and minor storm drain items. The contractor shall prepare the bid in accordance with the following schedule of improvements: Stage 1: Utilities Work includes installation minor storm drain items and fire hydrant spool and testing at various locations per plan. Work includes construction of curb, gutter, driveways, valley gutter, removal and construction of new HMA and Class II Aggregate Base section with subgrade preparation. Split the reconstruction of this alleyway and driveways into two separate stages. First, the western half of the alleyway would be closed for the reconstruction while maintaining access to the eastern units from Ponderosa Avenue. Upon completion, the eastern half of the alleyway would be closed and reconstructed while maintaining access to the western units from Columbia Avenue. Stage 3: Alley 2 Between B and C Streets from 10th to 11th and Alley 3 Between D and E Streets from 9th to 10th Work includes construction of curb, gutter, driveways, valley gutter, removal and construction of new HMA and Class II Aggregate Base section with subgrade preparation. Stage 4: Alley 4 Between D and E Streets from 12th to 13th and Alley 5 Between D and E Streets from 13th to 14th Work includes construction of curb, gutter, driveways, valley gutter, removal and construction of new HMA and Class II Aggregate Base section with subgrade preparation. Stage 5: Alley 6 Gum Avenue from East to Sunset Avenue Work includes construction of curb, gutter, driveways, valley gutter, removal and construction of new HMA and Class II Aggregate Base section with subgrade preparation. Stage 6: Alley 7 Between Early and Duff Avenues from Sunset to Columbia Work includes construction of curb, gutter, driveways, valley gutter, removal and construction of new HMA and Class II Aggregate Base section with subgrade preparation. Stage 7: Alley 8 Between E and F Street from 15th to East Avenue and Alley 9 Between F and G Streets from 16th to East Avenue Work includes construction of curb, gutter, driveways, valley gutter, removal and construction of new HMA and Class II Aggregate Base section with subgrade preparation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$804,956.00

Public - City

Paving, Site Work

26

7

4

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
45
Bidding Soon
620
All Active Projects
292
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 27, 2022

November 28, 2022

February 20, 2023

img_map_placeholder

Multiple Locations, Reedley, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.