BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a civil project in Newington, Connecticut. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

The Connecticut Department of Transportation (CTDOT) will soon be seeking to retain a Contractor consisting of a Construction firm and a Design firm to execute a Design-Build Contract for the design and construction of CTDOT Project No. 0063-0726: Rehabilitation of Dutch Point Viaduct Bridge No. 01469B carrying I-91 SB over CSORR, SR 598 WB and TR 803 in the City of Hartford, Connecticut. The Project scope will include but not be limited to design and construction of replacement of the concrete bridge deck and joints, roadway drainage investigation and replacement of the collection and discharge system, replacement of the roadway lighting system, superstructure strengthening to accommodate all legal and permit vehicle loads, steel coatings system, rehabilitation of the bearings, steel pier bents and bracing systems rehabilitation, substructure rehabilitations, and highway and traffic engineering, as well as load rating analysis, environmental permitting, railroad and utility coordination and accommodations, access provisions beneath the bridge for local stakeholders, and contractor quality control. The solicitation will be open to all construction contractors prequalified by CTDOT for Group No. 9 - Intermediate Bridges, who qualify for Scope Code M. The Contractor is hereby notified that a Project Labor Agreement (PLA) is not required as part of this Contract. Scope Code M - $ 40,000,000 - $ 59,999,999 Construction firms interested in participating in the selection process that do not hold the prequalification stated above with CTDOT should initiate the prequalification process as soon as possible. There are no specific CTDOT prequalification requirements for the Consulting Engineering firms for this solicitation. The qualifications of the Consultant Engineering firms will be evaluated through the selection process. If there are any questions or issues related to obtaining the necessary documents, please inquire by e-mailing the question to CTDOT.Design.Build@ct.gov. CTDOT - RFQ D/B - Dutch Point Viaduct Bridge No. 01469B

Post-Bid

Roads / Highways

$60,000,000.00

Public - State/Provincial

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
493
Active Projects
292
Bidding Soon
4,661
All Active Projects
1,957
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2023

June 14, 2024

img_map_placeholder

To Be Determined, Newington, CT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.