Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in South Salt Lake, Utah. Completed plans call for site work for a water / sewer project.
The installation of approximately 4,489-feet of new 12-inch PVC sewer pipeline with manholes along 300 East; Haven Avenue to Leslie Avenue, Leslie Avenue; 300 East to State Street, and State Street; Leslie Avenue To 2700 South. The total length of pipe includes replacing existing 8 and 10-inch sewers, by-pass pumping, surface restoration, reconnection of service laterals, coordination with UDOT, and incidental work to provide a functioning sewer system. West Temple Sewer Improvements: The installation of approximately 1,848-feet of new 30-inch GFRP sewer pipeline with manholes along West Temple Street; 2400 South to Utopia Avenue. The total length of pipe includes replacing existing 18 sewers, by-pass pumping, surface restoration, reconnection of service laterals, coordination with UTA, installing 75-feet of 30-inch pipe with 40-inch new steel casing jack and bored under UTA tracks, and incidental work to provide a functioning sewer system. Also, the rehabilitation of 1,951-feet of 15-inch VCP and 188-feet of 18-inch VCP sewer trunk line from 2700 South to 2400 South utilizing CIPP and open cut construction of point repairs including the reinstatement of service laterals. Project Estimate is a range of $5,000,000 to $10,000,000. What is shown is the highest end of that range. Questions: Due October 31, 2022 5:00 PM. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect 300 East Sewer Improvements: The installation of approximately 4,489-feet of new 12-inch PVC sewer pipeline with manholes along 300 East; Haven Avenue to Leslie Avenue, Leslie Avenue; 300 East To State Street, and State Street; Leslie Avenue To 2700 South. The total length of pipe includes replacing existing 8 and 10-inch sewers, by-pass pumping, surface restoration, reconnection of service laterals, coordination with UDOT, and incidental work to provide a functioning sewer system. West Temple Sewer Improvements: The installation of approximately 1,848-feet of new 30-inch GFRP sewer pipeline with manholes along West Temple Street; 2400 South to Utopia Avenue. The total length of pipe includes replacing existing 18 sewers, by-pass pumping, surface restoration, reconnection of service laterals, coordination with UTA, installing 75-feet of 30-inch pipe with 40-inch new steel casing jack and bored under UTA tracks, and incidental work to provide a functioning sewer system. And the rehabilitation of 1,951-feet of 15-inch VCP and 188- feet of 18-inch VCP sewer trunk line from 2700 South to 2400 South utilizing CIPP and open cut construction of point repairs including the reinstatement of service laterals.
Award
Water / Sewer
$5,196,410.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 3, 2022
January 2, 2023
Multiple Locations, South Salt Lake, UT
Related To This Project
South Salt Lake, UT
--
South Salt Lake, UT
--
South Salt Lake, UT
Bid Date: Nov 17 2022
South Salt Lake, UT
Bid Date: Nov 18 2022
DFCM Construction - UU HMHI Receiving Center-Okland Courtesy Posting Mechanical/Electrical - 4421937
South Salt Lake, UT
Bid Date: May 17 2022
South Salt Lake, UT
Bid Date: Nov 23 2022
South Salt Lake, UT
Bid Date: Nov 23 2022
South Salt Lake, UT
Bid Date: May 24 2022
South Salt Lake, UT
Bid Date: Oct 26 2022
Salt Lake City, UT
--
Riverton, UT
Bid Date: Jun 24 2021
Wanship, UT
Bid Date: Oct 25 2022
Washington Terrace, UT
Bid Date: Apr 11 2022
Dugway, UT
Bid Date: Oct 25 2022
Garden City, UT
Bid Date: Nov 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.